If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Civil And Construction
Eprocure
Opening Date15 Dec 2018
Closing Date29 Jan 2019
Tender Amount₹ 4,54,62,449
Costs
EMD
₹ 9,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPKDA_283906_1Bid Award Id
ViewTender No
D/54/AA3/KDA/18-19Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub base by providing close graded materials spreading in uniform layers with motar grader on prepared surface, mixing by mix in place method with rolavatorat OMC and compacting with vibratory roller to achieve the desired density completes as per clause 401
73
-
2820
... More
Providing and laying of wet mix macadum by providing close graded material sprerdding in uniforms layers with motor graders on prepared surface mixing by mix in place metod with rolavatroat OMC and compecting with roller to achive reqired dencity complete including supply of all material labour tnp required proper complition of work.
79
-
3125
... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.75 kg per sqm. using mechanical means as per technical specification class 502
315
-
25.8
... More
Providing and applying tack coat with bitumen emulsion pressure distributor @ 0.25 Kg/sqm anther prepared bituminous/granular surface cleaned with mechanical broom before B.M/ SDC
315
-
9.5
... More
P/L Bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 ton per hours using crushed aggregates of specified grading premixed with bituminous binder transported to site Laid over preiously prepared surface with paver finisher including supply of all material labour T&P required proper completion of work (3.4%VG-30).
52
-
6440
... More
P/L semi dance bituminous concrete 25 mm thick compacted with 100-120 TPH batch type HMP prosecuting an average output of 75 tones per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site laying with hydraulic paver finisher with sensor control to the required grade, level and alignment rolling with smooth wheeled vibratory type roller to achieve the desired compaction as per MORT & H specification clause no 508.
29
-
7830
... More
Wideing & REPAIRING ROAD
-
-
-
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M in depth and earth work in embankment to be in 20mm thick layers including ramming and dressing the surface to required levels and slope and also including 1.5 lift and 30m lead the earth from cutting to be used in making embankment.
2800
-
95
... More
Cartege of earth including loding unloding and cartage of 5.00 km etc all complete as per directed by E/I.with royality. (S.NO-253A+Cartage+for Disposal.
2800
-
138.4
... More
Construction of granular sub base by providing close graded materials spreading in uniform layers with motar grader on prepared surface, mixing by mix in place method with rolavatorat OMC and compacting with vibratory roller to achieve the desired density completes as per clause 401
2376
-
2820
... More
Providing and laying of wet mix macadum by providing close graded material sprerdding in uniforms layers with motor graders on prepared surface mixing by mix in place metod with rolavatroat OMC and compecting with roller to achive reqired dencity complete including supply of all material labour tnp required proper complition of work.
200
-
3125
... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.75 kg per sqm. using mechanical means as per technical specification class 502
800
-
25.8
... More
Providing and applying tack coat with bitumen emulsion pressure distributor @ 0.25 Kg/sqm anther prepared bituminous/granular surface cleaned with mechanical broom before B.M/ SDC
12000
-
9.5
... More
P/L Bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 ton per hours using crushed aggregates of specified grading premixed with bituminous binder transported to site Laid over preiously prepared surface with paver finisher including supply of all material labour T&P required proper completion of work (3.4%VG-30).
990
-
6440
... More
P/L semi dance bituminous concrete 25 mm thick compacted with 100-120 TPH batch type HMP prosecuting an average output of 75 tones per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site laying with hydraulic paver finisher with sensor control to the required grade, level and alignment rolling with smooth wheeled vibratory type roller to achieve the desired compaction as per MORT & H specification clause no 508.
552
-
7830
... More
P/L of 80mm thick rubber moulded interlocking tyles over 40mm thick local sand including supply of all material labour tnp required proper complition of work. (Approved Rate)
4480
-
669.5
... More
P/Laying of HOT applied thermo plaster 2.5mm thick inelaying rtefier clorising glam beads @ 250gram/sqm thickness of 2.5mm in exclusive of surface applied glam beads as per IRC 35 THE FINISHED SURFACE TO BE LEVEL CONFORM AND FROM Streaks and hold.
280
-
345.45
... More
CONSTUCTION OF DIVIDER
-
-
-
... More
Earthwork: Excavation in foundation etc. in ordinary soil including lift upto 1.5m lead upto 30m including filling watering and removal of surplus earth as directed by the Engineer-in-charge specification all complete.
144
-
110
... More
P.C.Concrete with 40mm gauge stone ballast, C sand, cement in 1:4:8 proporation in foundation of material, labour, T and P etc complete. (SI NO-281)
48
-
4800
... More
R.C.C. work in wall with1:1.5:3 Ratio cement concret work including supply of all material labour and T&P etc excluding the cost of Re-inforcement. Binding wire necessary centeraing & shuttring.
160
-
7700
... More
MS or iron work in plain work such as R.B., RCC work (when not included in over all rates) wrought to requirec shape as necessuary including Bendig for Proper Completion of the work & also supply of steel &its westage Bend Hooks & Authrosied Over Lapping shall be measured up to floor two level.
251.2
-
5500
... More
15mm thick Cement plaster with 1:3 cement c-sand mortar with supply of all the material labour T&P etc
800
-
175
... More
Finishing wall with water proofing cement paint of approved quality with two coat to given an even shade including supply of all materials labour T&P complete . (S.I.N-660)
800
-
51
... More
DRAIN
-
-
-
... More
Dismentling of b/w cement mortar and stacking of material as per direction of E/I (si-692)
588
-
380
... More
Deduction cost of bricks /w.(si-1a)
67620
-
5.6
... More
Deduction cost of b/b.(si-2c)
441
-
850
... More
Earthwork: Excavation in foundation etc. in ordinary soil including lift upto 1.5m lead upto 30m including filling watering and removal of surplus earth as directed by the Engineer-in-charge specification all complete.
1406
-
110
... More
Cartege of earth including loding unloding and cartage of 5.00 km etc all complete as per directed by E/I.with royality. (S.NO-253A+Cartage+for Disposal.
1406
-
138.4
... More
Cement concrete with 4 cm gauge stone ballast fine sand & cement in proportion of 4:2:1 including supply of all material labour T & P etc required for proper completion of the work as per direction of E/I. SI.No. 279/2018
135
-
5830
... More
R.C.C. work in raft with1:1.5:3 Ratio cement concret work including supply of all material labour and T&P etc excluding the cost of Re-inforcement. Binding wire necessary centeraing & shuttring.
303.45
-
6611
... More
R.C.C. work in wall with1:1.5:3 Ratio cement concret work including supply of all material labour and T&P etc excluding the cost of Re-inforcement. Binding wire necessary centeraing & shuttring.
710.12
-
7700
... More
R.C.C. work in slab with1:1.5:3 Ratio cement concret work including supply of all material labour and T&P etc excluding the cost of Re-inforcement. Binding wire necessary centeraing & shuttring.
16.2
-
7091
... More
MS or iron work in plain work such as R.B., RCC work (when not included in over all rates) wrought to requirec shape as necessuary including Bendig for Proper Completion of the work & also supply of steel &its westage Bend Hooks & Authrosied Over Lapping shall be measured up to floor two level.
2019
-
5500