Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Feb 2024
Closing Date23 Feb 2024
Tender Amount₹ 11,00,000
Costs
EMD
₹ 22,000Document Cost
₹ 266Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_898387_13Bid Award Id
ViewTender No
22/EE/2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Cement concrete For R.C.C. (1:1.5:3) with cement, coarse sand, and 25 mm to 10 mm stone grit including cost of all material, labour and T&P etc.complete.
15.93
-
-
... More
Providing and laying Cement concrete (1:1.5:3) with cement, coarse sand, and 25 mm to 10 mm stone grit including cost of all material, labour and T&P etc.complete.
2.1
-
-
... More
Providing and laying Cement concrete (1:2:4) with cement, coarse sand, and 25 mm to 10 mm stone grit including cost of all material, labour and T&P etc.complete.
6.6
-
-
... More
Centering and shuttering of C.C. work including rent of shuttring material, labour T&P requird for proper completion of work etc.
33.64
-
-
... More
Steel Reinforcement Fe-415 Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steel including cost of all material, labour and T&P etc.complete./ M.T.
1.14
-
-
... More
Cement pointing 1:2 (struck Deep) on brick masonry up to 3 M height in cement & coarse sand including cost of all material, labour and T&P etc. complete
83.06
-
-
... More
P/Fixing 110 mm dia. PVC pipe 6 kg/sqcm per R.M. including cost of all material, labour and T&P etc. complete
2.4
-
-
... More
Earth work in embankment by power tranported earth lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete as directed by Engineer-in-charge.
301.35
-
-
... More
Earth work in cutting /Removing Earth including lift up to 1.50 M and lead up to 30M including ramming and dressing by manual labour. T as directed by Engineer-in-charge.
243.75
-
-
... More
Dismantling Brick work or Cement Concrete in cement work including disposal of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).
36.48
-
-
... More
Dewatring for excavation of work including all material labour T&p Pol etc
160
-
-
... More
Finishing wall with Two Coat of Weather coat Cement Paint Approved quality as asian and one coat of Primer etc including all cost of material, labour and T&P etc. complete.
20.84
-
-
... More
Painting latters up to 10.0 cm height including all cost of material, labour and T&P etc. complete
60
-
-
... More
Filling empty cement bags with transported earth /rbm/silt upto a lead of 1.0 km hand sewing with suja and sutli placing in position i/c cost of cartage of earth labour t&p etc
1312.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements