Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Oct 2024
Closing DateCancelled
Tender Amount₹ 31,86,000 
Notes
Download

Costs

Summary

Repairing And Painting Of Dameged Railing/ Parapet, Wing Wall And Flooring Of D.r.b. At Km. 6.600 Of Gilaula Escape Channel

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and laying of course sand in inverted filtter . Including cost of all labour, Material, T & P required for proper completion of work

51.96

-

-

... More
Supply and laying of pea gravel in inverted filtter . Including cost of all labour, Material, T & P required for proper completion of work

77.95

-

-

... More
1st class Brick work in 1:4 C.M.with cement,coarse sand of F.M. not less than 2.00 mm. including cost of all labour,material,T&P etc.required for proper completion of work.

66.56

-

-

... More
1st class Brick on edge pitching including 08 mm mortar bebow under neath in 1:3 C.M.with cement,coarse sand of F.M. not less than 2.00 mm. including cost of all labour,material,T&P etc.required for proper completion of work.

749.03

-

-

... More
Struck cement pointing (1:2) with cement mortor and coarse sand of F.M. is not less than 2.0 including cast of all material, labour, T&P etc. required for proper completion of work.

80.26

-

-

... More
S/Laying 20-40 kg Boulder pitching in Aprons of floor of U/S & D/S of D.R.B.at km. 6.600 of Gilaula Escape Channel within 30m lead.including cast of all material, labour, T&P etc. required for proper completion of work.

133.81

-

-

... More
Finishing wall with Acrylic smooth exterior paint of required shade on new work (two or more coats applied @ 1.67 ltr per 10 sqm.over & including priming coat of exterior primer applied @ 2.20 kgs.per 10 sqm.)(Ace adv,Walmasta) Asian,Berger etc. including cast of all material, labour, T&P etc. required for proper completion of work.

1067.84

-

-

... More
Earth work in back filling i/c all material,labour,T&P etc required for proper completion of work.

121.38

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.