Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date4 Jan 2025
Closing Date12 Feb 2025
Tender Amount₹ 1,88,52,00,000 
Notes
Download

Costs

Summary

Restoration Of Ken Main Canal From Km. 0.000 To 31.600 In Restoration Of Ken Canal System

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc.

66510

-

-

... More
Earth Work in excavation of foundation in hard rock by blasting including cost of drilling and explosive, its removal and proper stacking beyond lead 1.00 km.

21118

-

-

... More
E/w in excavation of rock without blasting including all cost of labour T&P ete required to complete work.

21118

-

-

... More
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.

9548

-

-

... More
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.

45878

-

-

... More
Centering & shuttering for R.C.C. slabs, lintels & simple beams work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.

123749

-

-

... More
Centering & shuttering for special type of R.C.C. syphons and pump houses work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.

3546

-

-

... More
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc.

1674

-

-

... More
Supplying & Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. per Cum.

20605

-

-

... More
Supplying & Laying C.C A40, M-10 in foundation of all structures with cement, coarse sand of F.M. not less than 2.0 and hard stone ballast (20-40 mm size) including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.

7861

-

-

... More
Supplying & Laying C.C. A20, M-15 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.

80035

-

-

... More
Supplying & Laying R.C.C. A20, M-25 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.

21743

-

-

... More
Dewatering with all cost of power/P.O.L, machines, pumps, well point system and operator with boring, assembling and dismantling of equipments etc. required for completion of work.

86500

-

-

... More
Supplying and laying rubber seal 225 mm width and 10 mm thickness at joints required for proper completion of work including cost of all materials, labour, T&P etc.

322

-

-

... More
Providing and fixing with making diamond copper seal in settlement joint or as in required location as per approved Drawing (shape and size) required for proper completion of work including cost of all materials, labour, T&P etc.

21

-

-

... More
Providing and fixing G.P.-Sheet 20 gauge in different structures at required locations as per approved drawing (shape and size) required for proper completion of work including cost of all materials, labour, T&P etc.

274

-

-

... More
Supplying & fixing joint filler board 18mm. thick as specified locations in different structures required for proper completion of work including cost of all materials, labour, T&P etc.

363

-

-

... More
Supplying & Painting Two coats of bitumen with two layers of tarfelt again followed by two coats of bitumen painting before laying R.C.C. slab required for proper completion of work including cost of all materials, labour, T&P etc.

584

-

-

... More
Providing expansion joint in R.C.C. slab including placing and fixing of angle iron & MS Plate and filling with sealing compound as per drawing required for proper completion. of work, including cost of all materials, labour, T&P etc.

224

-

-

... More
S/F Drainage spout pipe 100 mm dia In RCC slab required for proper completion of work including cost of all materials, labour, T.& P etc.

118

-

-

... More
Supplying and fixing 1200 mm dia NP-3 hume pipe required for proper completion of work including cost of all materials, labour, T&P etc.

3060

-

-

... More
Supplying and driving "Z" "type sheet piles of required size in different structures with cutting, welding including cost of all materials, labour, T&P etc.

197

-

-

... More
Supplying and Laying in Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all materials, labour, T&P etc.

2220

-

-

... More
Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work with Dismentaled old Brick including cost of labour, T&P etc.

330

-

-

... More
Dismantling Brick on Edge Soling on diversion including stacking required for proper completion of work with cost of labour, T&P etc.

1650

-

-

... More
Providing & Laying R.C.R. 1 : 4 Cement Sand Mortar required for proper completion of work including cost of all materials, labour, T&P etc.

275

-

-

... More
Struck Raised Pointing on stone masonry in C.M. 1 : 2 required for proper completion of work including cost of all material T&P, labour etc.

142

-

-

... More
Supplying & Laying Coarse sand as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.

426

-

-

... More
Supplying & Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.

426

-

-

... More
Supplying & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.

426

-

-

... More
Providing & Laying Boulder (25-60 kg) Apron for Bed protection with stone boulder required for proper completion of work including cost of all materials, labour, T&P etc.

4139

-

-

... More
Laying Boulder Apron for Bed protection with old stone boulder taken from demolished structure required for proper completion of work including cost of all materials, labour, T&P etc.

1034

-

-

... More
Supplying & Filling of moorum (C.N.S.) in embankment i/c loading & unloading all cost of material labour T&P and dressing making profile in proper compaction etc.

134807

-

-

... More
Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc.

231741

-

-

... More
Supplying & Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc.

4880

-

-

... More
Cement plaster 12.50 mm thick in 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.

206561

-

-

... More
Supplying & Laying two coat Bitumen painting on sleeper top required for proper completion of work including cost of all materials, labour, T&P etc.

25183

-

-

... More
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc.

254915

-

-

... More
Providing & Laying 100 mm thick Cement Concrete Lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 by Paver Machine on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc.

231600

-

-

... More
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc.

9795

-

-

... More
Dismentling of existing structures like culvert, Fall, Bridge and other structures comprising of stone/brick masonry, cement /lime concrete including disposal of unserviceable material and stacking the serviceable material etc.

2507

-

-

... More
Dismentling of existing Grouted stone pitching/Lining including disposal of unserviceable material and stacking the serviceable material etc.

2212

-

-

... More
Dismantling of Old R.C.C Structure including stacking required for proper completion of work with cost of all material, labour and T:& P. etc.

125

-

-

... More
Earth Work in Dismantling of Diversion/Approach Road/Ramp required for proper completion of work including cost of all labour and T&P etc.

11695

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.