Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil Works Others
Eprocure
Opening Date2 Jan 2020
Closing Date8 Jan 2020
Tender Amount₹ 27,94,000
Costs
EMD
₹ 56,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPIDC_417934_17Bid Award Id
ViewTender No
01/EE/SNK-4/2019-20Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centering and shuttering for C.C. and R.C.C. work upto 10m span including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
199
-
-
Two coat of bitumen painting with two layers of tarfelt again followed by two coats of bitumen painting before laying RCC slab including all taxes, cost of all material, labour and T&P, etc. required for proper completion of work.
13.5
-
-
Cutting, bending, binding & placing of steel reinforcement in proper position including all taxes, cost of binding wire, steel, labour and T&P etc. required for proper completion of work.
1.14
-
-
S/F 20 mm thick joint filler board in construction joint including all taxes, cost of material, labour and T&P, etc. required for proper completion of work.
13.5
-
-
Laying RCC 1:1.5:3 using 4.75 mm to 20 mm size crushed kabrai stone grit with hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. except steel with mechanical compaction required for proper completion of work.
32
-
-
Cement pointing (Struck deep) in 1:2 cm with hamirpur fine coarse sand including all taxes, cost of all material, labour & T & P etc. required for proper completion of work.
216
-
-
E/W in embankment in making ramp in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.
1770
-
-
E/W in embankment in making road diversion in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.
2050
-
-
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
5700
-
-
S.O.B. brick on edge soling on diversion/ramp including preparation of subgrade and filling joints with local sand including all taxes, cost of all labour and t&p. required for proper completion of work.
350
-
-
S/f wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P, etc. required for proper completion of work.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements