Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Irrigation Work
Agriculture or Forestry Works
Eprocure
Opening Date16 Feb 2024
Closing Date21 Feb 2024
Tender Amount₹ 5,71,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC Lining of Jadol Dy.(Lining of canal)

-

-

-

... More
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.

3173.23

-

-

... More
Provide shuttering and centering including all materials and T&P etc for proper complition of work.

3180.25

-

-

... More
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.

241.09

-

-

... More
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.

1384.17

-

-

... More
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.

15448.9

-

-

... More
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work

929.96

-

-

... More
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work

3340.62

-

-

... More
CC Lining of Jadol Dy.(Lining in head reach of offtaking canals)

-

-

-

... More
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.

204.25

-

-

... More
Provide shuttering and centering including all materials and T&P etc for proper complition of work.

271.12

-

-

... More
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.

23.71

-

-

... More
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.

80.21

-

-

... More
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.

960.2

-

-

... More
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work

62.37

-

-

... More
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work

193.19

-

-

... More
CC Lining of Jadol Dy.(Lining in U/S & D/S of VRB/DRB)

-

-

-

... More
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.

1990.93

-

-

... More
Provide shuttering and centering including all materials and T&P etc for proper complition of work.

2415.86

-

-

... More
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.

199.61

-

-

... More
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.

817.65

-

-

... More
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.

9507.2

-

-

... More
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work

577.86

-

-

... More
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work

2000.61

-

-

... More
Construction of Outlets at Right Bank and left Bank of Jadol Dy. From km 0.00 to km 17.400

-

-

-

... More
Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge.

1206.22

-

-

... More
Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc

119.23

-

-

... More
Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition

254.13

-

-

... More
Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge.

393

-

-

... More
Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc.

911.28

-

-

... More
Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.

47.83

-

-

... More
Painting work on cemented or brick surface one prime coat and one coat of dry distemper in new surface incl. all material & labour etc.

1473.74

-

-

... More
Construction of Boundary Pillars of Jadol Dy. From km 0.000 to km 17.400 (362 Nos)

-

-

-

... More
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.

362

-

-

... More
Providing & Laying cement concrete in foundation (1:2:4) stone grit, incl fixing of poles etc.sand including supply of all material, labour, tools and plants etc

113.03

-

-

... More
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.

298.65

-

-

... More
Providing & Laying R.C.C. M-20 1:1.5:3 nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc.

37.33

-

-

... More
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.

3.62

-

-

... More
Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height

362

-

-

... More
Construction of Brick soling on service road of Jadol Dy. M.G.C Stage-I

-

-

-

... More
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work..

29700

-

-

... More
Maintanace of Cattle Ghat at km 2.395 of Jadol Dy.

-

-

-

... More
Brick Work with M-15 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.

15.96

-

-

... More
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.

103.45

-

-

... More
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.

90

-

-

... More
Repair of VRB/DRB of Jadol Dy from km 0.000 to 17.400.

-

-

-

... More
Ist class Brick Work in 1:4 CM M-150 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.

48.61

-

-

... More
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.

128.92

-

-

... More
One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work

867.98

-

-

... More
Providing and fixing of Hazard maker including cost of all material labour and T&P etc.

24

-

-

... More
Providing and fixing of Sign board including cost of all material labour and T&P etc.

4

-

-

... More
painting and printing letters upto 30cm height including supply all material labour T&P etc required for proper completion of work at VRB

26

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.