Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date26 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 18,39,000
Costs
EMD
₹ 36,800Document Cost
₹ 1,154Tender Fee
Refer Documents
Summary
Construction Of Canal Crossing At Km 49.300 Of Kabrai Main Canal (lot-03)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_904728_3Bid Award Id
ViewTender No
07/EE/2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying A40 M 10 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 4.36 Bags Per Cum Including Cost Of All Material, Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
25.38
-
-
... More
Laying A20 M 15 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
25.24
-
-
... More
Supplying and fixing 600 mm dia RCC Hume Pipe Including Cost Of material, Labour T&P etc. with all leads & lift for proper completion of Job.
32.5
-
-
... More
Joint fixing with M15 C.C 1:2:4 including cost of material labour T&P etc. with all leads & lift For proper completion of Job.
4.16
-
-
... More
Steel Reinforcement for R.C.C Work Including Cutting, Bending, Binding With G.I Wire & placing in position with cost of steel Reinforcement.
0.98
-
-
... More
Centering & Shuttering For R.C.C. Work With All Cost Of Labour Material T&P Etc. Required For Completion Of Work.
93.18
-
-
... More
Laying R.C.C 1:2:4 cement concrete by machanical mixing & Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
16.85
-
-
... More
E/W In Back Filling With All Cost Of Labour, Material, T&P With Proper Completion Of Work.
312.19
-
-
... More
Supply and laying sand mixed with ballast in inverted filter including cost of material, labour and T.&P. etc with all leads & lefts for completion of job. As per direction of Engineer-in- charge.
45.26
-
-
... More
Supplying And Laying Dry Stone Pitching In Canal Bed & Sides Including Cost Of All Material Labour, T&P Etc All Leads & Lift For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
101.81
-
-
... More
Dewatering by 10 H.P. Pump including all material labour fuel etc. as proper completion of work as per direction of Engineer-in-charge. complete.
200
-
-
... More
E/w in filling for making Embankment and cutting canal cross section after machanical compaction including dressing and watering with all leads & lifts labour charges and T &P etc. proper completion of work.
2729.9
-
-