If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date26 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 18,39,000 
Notes
Download

Costs

Summary

Construction Of Canal Crossing At Km 49.300 Of Kabrai Main Canal (lot-03)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying A40 M 10 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 4.36 Bags Per Cum Including Cost Of All Material, Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.

25.38

-

-

... More
Laying A20 M 15 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.

25.24

-

-

... More
Supplying and fixing 600 mm dia RCC Hume Pipe Including Cost Of material, Labour T&P etc. with all leads & lift for proper completion of Job.

32.5

-

-

... More
Joint fixing with M15 C.C 1:2:4 including cost of material labour T&P etc. with all leads & lift For proper completion of Job.

4.16

-

-

... More
Steel Reinforcement for R.C.C Work Including Cutting, Bending, Binding With G.I Wire & placing in position with cost of steel Reinforcement.

0.98

-

-

... More
Centering & Shuttering For R.C.C. Work With All Cost Of Labour Material T&P Etc. Required For Completion Of Work.

93.18

-

-

... More
Laying R.C.C 1:2:4 cement concrete by machanical mixing & Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.

16.85

-

-

... More
E/W In Back Filling With All Cost Of Labour, Material, T&P With Proper Completion Of Work.

312.19

-

-

... More
Supply and laying sand mixed with ballast in inverted filter including cost of material, labour and T.&P. etc with all leads & lefts for completion of job. As per direction of Engineer-in- charge.

45.26

-

-

... More
Supplying And Laying Dry Stone Pitching In Canal Bed & Sides Including Cost Of All Material Labour, T&P Etc All Leads & Lift For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.

101.81

-

-

... More
Dewatering by 10 H.P. Pump including all material labour fuel etc. as proper completion of work as per direction of Engineer-in-charge. complete.

200

-

-

... More
E/w in filling for making Embankment and cutting canal cross section after machanical compaction including dressing and watering with all leads & lifts labour charges and T &P etc. proper completion of work.

2729.9

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.