Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Bridge Construction
Civil And Construction
Eprocure
Opening Date30 Oct 2024
Closing Date6 Nov 2024
Tender Amount₹ 57,10,000
Costs
EMD
₹ 1,15,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Summary
Repairing Of Vrb Of Basgawa Minor At Km 5.600, Barahan Minor At Km 1.550, Prahaladpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_968775_2Bid Award Id
ViewTender No
05/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work digging in foundation with all lead & lift in all types of soil with proper disposal as per direction site In-charge
855.5
-
-
Laying C.C.1:3:6 in base conc. In foundation with stone ballast 20 to 40 mm.,coarse sand and cement including cost of all material labour.T&P etc.required for proper completion of work
190.4
-
-
First class brick work for in 1:4 C.M. with coarse sand including cost of all material, labour and T & P etc required for proper completion of work.
478.6
-
-
Centering & Shuttering for C.C/ R.C.C. work including Rent of shuttering material , labour and T&P required for proper completion of works
156.5
-
-
providing steel Bending, Binding, Cutting and placing in position steel reinforecement including cost of Binding wire, all materials labour, T&P etc required for proper completion of work.
3.27
-
-
P/L R.C.C. 1:1.5:3 hard stone grit 10 to 20 mm size including cost of all materials ,labour, T&P etc required for proper completion of work.
52.6
-
-
Deep ruled cement pointing in 1:2 C.M.with one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.
761.2
-
-
Distempering with dry distemper of approved brand(two coat) over on one priming coat of whiting on new surface after througly brushing the surface free from dropping and other foreign matter including preparing the surface even and sand panerd smooth etc Complete.
195.3
-
-
Earth Work in Reamoving Diversion of Road and disposal on Top bank including lead ,lift and cost of all material, Labour,T&P etc complete.
30
-
-
C.C. (1:2:4) in Bed including cost of all material ,labour ,T&P etc complete.
13.7
-
-
Preparation of sub grade for lining excluding cost of earth work including cost off all material ,labour ,T&P etc
12.6
-
-
P/L local sand including cost of all material labour.T&P etc.required for proper completion of work
1.26
-
-
Laying Double Layer of Flat brick lining in 1:3 cement mortor with 8 mm on the bed of channel including 15 mm thick cement plaster on top. including construction of curing drainsover patra including scaffolding ,cost of all material, labour T&P etc.as per directed by Engineer in charge.
12.6
-
-