Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Bridge Construction
Civil And Construction
Eprocure
Opening Date23 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 68,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in foundation in dry ordinary soil including lift upto 1.5m and lead up to 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer In Charge up to distance of 30m from the foundation trenches.

265

-

-

... More
Laying C.C 1:2:4 (M-15) including all cost of labour, material, T&P etc. required for proper completion of the work. /cum

136

-

-

... More
R.C.C 1:1.5:3 (M-20) i/c all cost of material, admixture, labour. T&P etc for proper completion of work

133

-

-

... More
Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work.

381

-

-

... More
Supplying and filling brick bats (O.B.) including all cost of labour, material, T&P etc. required for proper completion of the work.

23

-

-

... More
Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work.

11

-

-

... More
E/W in removing bund i/c disposal with cost of labour T & P etc. complete

102

-

-

... More
Supplying and fixing PVC pipe 75mm dia for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work.

6

-

-

... More
Providing and laying R.C.C hume pipe NP-3, 1200 mm dia including all cost of labour, material, T&P etc.

20

-

-

... More
Earth work for Making ramp & diversion by power tranported earth with a lead beyond 200m.and upto 1.00Km including excavation, loading unloading manual compaction dressing and all lead&lift cost of labour, material,T&P etc. required for proper completion of the work. /cum

5233

-

-

... More
Supply and laying 1st class brick Dry brick on edge soiling including all cost of labour, material and T&P etc. complete.

640

-

-

... More
Supplying and fixing marble plate 300x300 mm size on vrb including all cost of labour, material, T&P etc. required for proper completion of the work.

2

-

-

... More
Distempering Ist coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials.

21

-

-

... More
Providing and Laying boulder 20 - 40 Kg. in apron including cost of all material, labour and T&P etc. complete.

96

-

-

... More
Providing and laying Coarse sand in filter including all cost of labour, material, T&P etc.

12

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.