Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Bridge Construction
Civil And Construction
Eprocure
Opening Date23 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 68,00,000
Costs
EMD
₹ 1,36,000Document Cost
₹ 4,130Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_896997_17Bid Award Id
ViewTender No
04/SE/2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in foundation in dry ordinary soil including lift upto 1.5m and lead up to 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer In Charge up to distance of 30m from the foundation trenches.
265
-
-
Laying C.C 1:2:4 (M-15) including all cost of labour, material, T&P etc. required for proper completion of the work. /cum
136
-
-
R.C.C 1:1.5:3 (M-20) i/c all cost of material, admixture, labour. T&P etc for proper completion of work
133
-
-
Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work.
381
-
-
Supplying and filling brick bats (O.B.) including all cost of labour, material, T&P etc. required for proper completion of the work.
23
-
-
Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work.
11
-
-
E/W in removing bund i/c disposal with cost of labour T & P etc. complete
102
-
-
Supplying and fixing PVC pipe 75mm dia for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work.
6
-
-
Providing and laying R.C.C hume pipe NP-3, 1200 mm dia including all cost of labour, material, T&P etc.
20
-
-
Earth work for Making ramp & diversion by power tranported earth with a lead beyond 200m.and upto 1.00Km including excavation, loading unloading manual compaction dressing and all lead&lift cost of labour, material,T&P etc. required for proper completion of the work. /cum
5233
-
-
Supply and laying 1st class brick Dry brick on edge soiling including all cost of labour, material and T&P etc. complete.
640
-
-
Supplying and fixing marble plate 300x300 mm size on vrb including all cost of labour, material, T&P etc. required for proper completion of the work.
2
-
-
Distempering Ist coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials.
21
-
-
Providing and Laying boulder 20 - 40 Kg. in apron including cost of all material, labour and T&P etc. complete.
96
-
-
Providing and laying Coarse sand in filter including all cost of labour, material, T&P etc.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements