Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date24 Jan 2019
Closing Date30 Jan 2019
Tender Amount₹ 13,00,000
Costs
EMD
₹ 65,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPIDC_298605_8Bid Award Id
ViewTender No
10/EE/18-19Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centering, shuttering for R.C.C. work including cost of all material, labour and T & P etc. required for proper completion of work.
47.6
-
-
Carriage, Cutting, bending binding & placing steel for reinforcement with cost of binding wire including cost of material labour, T&P etc. required for proper completion of work.
1.56
-
-
Laying R.C.C. in 1:1.5:3 with 4.75 mm. to 20 mm size stone Grit and coarse sand including all lead & lift with cost of all material labour, T&P etc. required for proper completion of work excluding cost of reinforcement, centering & shuttering.
21.29
-
-
Laying C.C 1:1, 5:3 with 4.75 mm. to 20 mm size stone Grit and coarse sand including all lead & lift with cost of all materials, labour, T&P etc. required for proper completion of work.
3.8
-
-
Cement pointing in 1:2 CM rule/ Stuck with coase sand including cost of all material, labour and T&P etc. required for proper completion of the work.
120.77
-
-
laying and fixting of Joint filler board including cost of all materal labour and T&P etc. required for proper completion of the work.
8.21
-
-
Earthwork in back filling with all type of soil including all lead & lift manual compaction & dressing to profile.
76
-
-
Supplying & fixing of Trafelt in two layer including cost of all material, labour and T&P requried for completion of work.
12.23
-
-
Earthwork in making road diversion with all type of soil including all lead & left manual complaction & dressing to profile.
2700
-
-
Earthwork in making road ramp with all type of soil including all lead & lift manual complaction & dressing to profile.
120.77
-
-
Dry B.O.E. Soling on road diversion with straight burnt brick including preparation sub-grade filling joint with local sand including cast of material labour and T&P etc. required for proper completion of work.
480
-
-
Dry B.O.E. Soling on ramp with straight burant brick including preparation sub grade filling joint with local sand including cast of materal labour and T&P etc. required for proper completion of work.
230
-
-
Providing Temporary Hutment
1
-
-
Supplying & Fixing of Sign Board
2
-
-
Supplying & Fixing of wheel Guaed
4
-
-
Providing of 75mm. PVC Pipe
1.08
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements