Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date22 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 4,71,22,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying of LDPE Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

901.55

-

-

... More
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge

380

-

-

... More
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge

118.66

-

-

... More
Providing and laying R.C.C. M-20 (1:1.5:3) with coarse sand, cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.

39.19

-

-

... More
Centering and shuttering of RCC Precast boundry piller size 300x300x1650 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.

636.5

-

-

... More
Painting of RCC Precast boundry piller size 250x250x1650 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.

342

-

-

... More
Providing and placing of steel reinforcement including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.

2917.85

-

-

... More
Earth work in excavation of foundation in ordinary soil with in 30 m lead and 1.50 m lift including refiling of of excavated earth in trench dressing and manual compaction

4364.59

-

-

... More
Cement concrete 1:3:6 in foundation including cost of all material and labour T&P etc

378.22

-

-

... More
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.

748.91

-

-

... More
Providing and fixing of 150 mm dia NP-2 RCC pipe

1725

-

-

... More
Cement pointing 1:2 cm including cost of labour materials T&P etc proper completion of work as perdirection of Engineer in charge

2232.9

-

-

... More
Earth work in restoration of bank in all type soil with in 30 m lead and 1.50 m lift including refiling of of excavated earth in trench dressing and manual compaction

18795

-

-

... More
Providing and laying C.C. (1:2:4) in coping with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.

86.09

-

-

... More
Earth work in foundation including didigging proper disposal.

2980.6

-

-

... More
Centering & shuttering for sleeper , C.C lining & Landing.

5856.54

-

-

... More
Providing and lying C.C M 15 (1:2:4) for sleeper

536.66

-

-

... More
Filling100 mm thick coarse sand

725.28

-

-

... More
Providing and lying stone grite 4.75 mm to 20 mm.

365.12

-

-

... More
Providing and lying 150 micron thick L.D.P.E film.

4773.04

-

-

... More
Providing & Laying C.C M 20 (1:1.5:3) lining .

725.28

-

-

... More
Filing sealing compound betwwen constraction & contraction joint in groove.

7823.68

-

-

... More
Face to be painted with sealing primer Between constraction joint .

410.76

-

-

... More
Class 150 Brick Work 1:4 Cement Mortar Complete in all Respect

36.18

-

-

... More
( M-20 Grade)C.C. coping on top of parapet

26.64

-

-

... More
Dismentaling Wearing Coat with Proper Disposal Including All Labour Material T&P etc.

8.16

-

-

... More
Providing and laying wearing coat ( M-20 Grade) 75 mm thick with proper finishing Including all material, labour T&P etc.

14.75

-

-

... More
Plastering 1:3 Cement Mortar with Proper Finishing Including all Material, Labour T&P etc.

473.04

-

-

... More
Cement Pointing With 1:2 Cement Mortar complete in all respect.

620.34

-

-

... More
Painting of Parapet Including all Material, Labour T&P etc.

3347.8

-

-

... More
Wheel gaurde

230

-

-

... More
Providing and fixing of spindle rod 50 mm dia of EN8 (high carbon) steel.

25.5

-

-

... More
Providing and fixing of thrust bearing for steel gate including cost of all materials, labour T&P etc. for proper completion of work.

13

-

-

... More
Supplying & fabrication and fixing of Mild steel/iron work in grill, gates, railing, door, window frames including cutting, drilling, welding, riveting and fixing hinges where necessary with fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer.Size 1 X1.5 X 0.008 X7850 =94.20 kg

575.37

-

-

... More
Oiling & Greasing steel regulator gate including cleaning of spindle rod, chuck nut and locking system, with mobile oil, grease, kerosene, cotton, labour T&P etc.

26

-

-

... More
Class 150 Brick Work 1:4 Cement Mortar Complete in all Respect

48.16

-

-

... More
(M10)C.C.1:3:6 in foundation with stone ballast/cum

5.85

-

-

... More
Plastering 1:3 Cement Mortar with Proper Finishing Including all Material, Labour T&P etc.

84.01

-

-

... More
Cement Pointing With 1:2 Cement Mortar complete in all respect.

212.99

-

-

... More
Distempering two coat of premium quality oil bound distemper ( Burger, Asian, Nerolac ) over one priming coat of cement primer on new surface after thoroughly brushing the surface free from mortar dropping making the surface even with plaster of pariss, whating and sand papered smooth including cost of materials, Labour, T & P etc. required for proper completion of work.

536.25

-

-

... More
Painting one coat red oxide primer and 2 Coat synthetic enamel paint on old surface with superior quality approved make for proper mentioned item No. 12 including cost of all material, labour T&P etc. required for proper mentioned on work.

176.33

-

-

... More
Removing old, paint from steel/wooden surface with paint remover and with caustic soda and making the surface even including cost of all materials.

176.33

-

-

... More
Plastering 1:3 Cement Mortar with Proper Finishing Including all Material, Labour T&P etc.

92.56

-

-

... More
Painting two coat of synthetic enamel paint on new surface (excluding cost of primer) superior quality such as luxol highgloss, apcolite, superiac,dulux, & 2 Coat Distamper and One coat Primer including cost of all material labour T&P etc. required for proper completion of work.

92.56

-

-

... More
Painting gauge on channels.

75

-

-

... More
Instalation of Sign board (providing fixing writing etc.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.