Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date21 Jan 2025
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Tender Notice-08/eemlcdmzp/2024-25, Lot-02

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.C.C. 1:3:6 with Cement , Course sand and Stone ballast Size 25 to 50 mm including all material, labour cost T&P etc. required for proper completion of the work.

4.95

-

-

... More
C.C. 1:3:6 with Cement , Course sand and Stone grit Size 12 to 20 mm including all material, labour cost T&P etc. required for proper completion of the work.

12.34

-

-

... More
Centering and Shuttering of RCC work including cost of all material, labour T&P etc. Required for proper completion of work.

150.47

-

-

... More
Cutting ,bending, binding and placing of reinforcement in position including cost of all labour, material and T & P ,binding wire for proper completion of work.

2.29

-

-

... More
Providing and laying of R.C.C. 1:1.5:3 with Cement , Course sand and dalla grit Size 12.5 to 20 mm including all material, labour cost T&P etc. required for proper completion of the work.

22.97

-

-

... More
Class 150 (Ist class) brick masonry work with 1:4 CM. including all material, labour cost T&P etc. required for proper completion of the work.

35.5

-

-

... More
Cement Plaster with 1:3 CM on birck works including all material, labour cost T&P etc. required for proper completion of the work.

403.13

-

-

... More
Finishing wall with white coloured two coat of Birla/ jk wall Putty including cost of all material, T&P etc. required for proper completion of the work.

403.13

-

-

... More
Painting of wall with Water proofing cement paint including cost of all material, T&P etc. required for proper completion of the work.

403.13

-

-

... More
Providing and Fitting Steel Door including cost of all material, labour and T&P etc. (Size1.20*2.10)

191

-

-

... More
Providing and Fitting Steel Window including cost of all material, labour and T&P etc. (Size1.0*1.0)

241

-

-

... More
Painting of Steel Door, Window and including cost of all material, labour and T&P etc.

18.72

-

-

... More
Brick on edge with M-150 brick (1:4) laid in cement mortar consisting of one part of cement & four part of coarse sand and pointed with cement mortar 1:2 over and 8 cm thick base concrete excluding supply of all materials but including labour T&P etc. required for proper completion of work.

69.47

-

-

... More
Supply and fixing of 8 to 10 mm thick white vertified tiles on flooring laid with 1:3 CM finished with white cement slury jointing and polishing complete.

57.53

-

-

... More
P/F of Aluminium door, 15 mm dia G.I. pipe, P.V.C. water tank, white glazed earthen ware, chrome plated copper pipe connection for sink, wash basin, cistern ,etc.

1

-

-

... More
Earth work Filling with all type of soil including Proper dressing & manual compaction and all lead beyond 2.0 Km. and upto 3.0 Km. Distance, labour T&P etc.

44.11

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.