Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date13 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 83,62,000
Costs
EMD
₹ 1,68,000Document Cost
₹ 3,702Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_901402_3Bid Award Id
ViewTender No
17/SE-XII/2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P/F Centering and shuttering for R.C.C. work including of all labour and T&P etc required for proper completion of the work as per direction of Engineer-in-Charge rates are without GST.
774.26
-
-
... More
P/L tor steel including cutting, bending, binding and placing in position including cost of binding wire, steel and labour and T&P etc required for proper completion of the work as per direction of Engineer-in-Charge rates are without GST.
9.19
-
-
... More
P/F 30.00x6.00mm@ 1.41 Kg/m M.S. Flat for Anchoring to give support to Grill as per drawing painted with red oxide primer & embeded portion shall be painted with two coat bitumen red oxide primer, two coat bitumen paint and wrapping, taping with LDPE film 200 micron of 1st grade including supply of all materials, labour,welding and T&P etc. required for proper completion of works as per direction of Engineer-in-Charge rates are without GST.
2550
-
-
... More
P/L C.C. 1:2:4 mix with Kabrai Stone Ballast 6.70-20mm gauge for block size 30.00x30.00x30.00 CM for anchor purpose of Grill including supply of all materials, labour and T&P etc required completion of works as per direction of Engineer-in-Charge rates are without GST.
13.77
-
-
... More
Laying R.C.C 1:1.5:3 mix with Kabarai crushed grit size 6.70mm-20mm Gauge including supply of all materials, labour and T&P etc required for proper completion of the work as per direction of Engineer-in-Charge rates are without GST.
172.95
-
-
... More
12.5 mm Thick Cement Plaster With 1:4CM on brick masonry including supply of all materials,labour and T&P etc required for proper completion of the work as per direction of Engineer-in-Charge rates are without GST.
992
-
-
... More
Repairing of plaster removal of old plaster, watering the area the existing surface including supply of all labour and T&P and disposal of refuse material within 60 meter etc required for proper completion of the work as per direction of Engineer-in-Charge rates are without GST.
992
-
-
... More
Painting with Enamel paint two coat on surface including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge rates are without GST.
1955.72
-
-
... More
Two coat plastic emulsion paint with one coat putty on surface including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge rates are without GST.
1364.25
-
-
... More
E/W in digging soil for filling filter material behind exsisting canal retaining wall joint including supply of all materials, labour and T&P etc required completion of works as per direction of Engineer-in-Charge rates are without GST.
31.55
-
-
... More
P/L Filter material of coarse sand and crushed grit (6.70mm to 20mm gauge & 20mm to 40mm gauge) over joint in canal diversion wall including supply of all materials, labour and T&P etc required completion of works as per direction of Engineer-in-Charge rates are without GST.
7.58
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements