If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Nov 2024
Closing Date25 Nov 2024
Tender Amount₹ 3,10,00,000
Costs
EMD
₹ 6,20,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Summary
Construction Of Vrb In Km. 51.240 Of Campierganj Branch
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_974560_3Bid Award Id
ViewTender No
Tender Notic 07/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying Reinforce cement concrete A20/M25 mix with cement coarse sand & stone grit including lead upto 60M and lift upto 3M with mechanical mixing and vibration including cost of all material, labour T&P etc. all complete.
899.66
-
-
... More
Laying Reinforce cement concrete A20/M30 mix with cement coarse sand & stone grit including lead upto 60M sand lift upto 3M with mechanical mixing and vibration including cost of all material, labour T&P etc. all complete.
40.37
-
-
... More
Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, carriage,rehandling and T.& P. etc.
107.58
-
-
... More
S/F 20mm thick joint filler board i/c cost of all material, labour T&P etc. complete for proper completion of works
22.12
-
-
... More
Hire charge of pumps with cost of all material, labour T&P etc. complete for proper completion of works
59000
-
-
... More
Providing expansion joint in R.C.C. including placing and fixing of angle iron & MS Plate and filling with sealing compound required for proper completion of work including cost of all material, labour and T.& P. etc.
26
-
-
... More
S/ F Drainage spout in RCC slab required for proper completion of work including cost of all materials, labour, T.& P. etc.
18
-
-
... More
Earth work in digging Diversion channel disposal on both side of proposed bank in 15 mtr. wide strips with a height of 2.0 mts. covering the disposal bank length 125.0mts. per cum.
6158.05
-
-
... More
Brick on Edge Soling on road diversion with preparation of subgrade and filling joints with local earth with proper completion of work including cost of all material, labour and T.& P. etc.
942.5
-
-
... More
Dismentling of brick on edge soiling its stacking at proper place of existing road.
440
-
-
... More
Dismantling of brick on Edge Soling on road diversion after completion of structure including cost of all material, labour and T.& P. etc.
680
-
-
... More
Supply and laying of mirzapur stone boulder(weight 25to 60 kg )
269.63
-
-
... More
S/L 1200mm dia thick NP3 hume pipe including with sipe got collar confirming IS 458:2003 i/c cost of all materials, labour T&P etc complete for proper completion of works .
37.5
-
-
... More
Field/soil investigation on the sites of construction work of canal under district Maharajganj by collecting disturbed and undisturbed soil samp less and performing sieve analysis atterbegs limit particle size analysis, Dry and bulk density natural moisture content finding C&O value and consolidation test for determination of compressive index values at different bore holes including preperation of Report.
80
-
-
... More
Earth work in filling with proper compaction in road diversion of structures of Campierganj Branch with a lead of 30M and lift upto 3.5M including all labour T&P etc. for proper completion of work including cost of all materials, labour, T.& P. etc.
750
-
-
... More
Providing and laying Tar paper bearing including including cost of all material, labour and T.& P. etc.
24.57
-
-