Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date17 Aug 2024
Closing Date26 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 19,000Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_946014_2Bid Award Id
ViewTender No
02/EE/SNK-6/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centering & shuttering for CC work including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
15.04
-
-
Ist class brick work in 1:4 CM with hamirpur corrse sand of F M not less than 2.0 including cost of all material,labour and T&P etc required for proper completion of work as per direction of Engineer-in-Charge.
56.74
-
-
Centering & shuttering for RCC work including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
17.77
-
-
Cutting, bending, binding& placing of steel reinforcement in proper position including cost of steel,bending wire, labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.
0.6
-
-
Supply and Laying two coat bitumen painting with two layer tarfelt etc. required for proper completion of work as per direction of Engineer-in-Charge.
3.74
-
-
Supply and fixing 20 mm thick joint filler board including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
3.32
-
-
Laying R C C 1:1.5:3 (M-20) using 4.75 mm to 20 mm size crushed kabarai stone grit with hamirpur coarse sand having F M not less than 2.0 including cost of all material, labour and T&P except steel, required for proper completion of work as per direction of Engineer-in-Charge.
5.18
-
-
Cement pointing in 1:2 (Deep struck) , 1 cement and 2 coarse sand F M not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
92.34
-
-
Supply and fixing of wheel guard including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
4
-
-
Earth work embankment in making ramp including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
228.75
-
-
S O B brick on edge soling including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
225
-
-
Earth work in removing road diversion including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
112.5
-
-
Dewatering with all cost of power, P.O.L., machines ,pump,well point system and operator etc. with assembling and deassembling of machines etc.required for proper complection of work as per direction of Engineer-in-Charge.
(a) Hiring charges of 5 HP deisel pum /gen. set including operator & P.O.L. for running hours.
80
-
-
(b) Cost of 9.00 M Boring.
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements