Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date17 Aug 2024
Closing Date26 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering & shuttering for CC work including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

15.04

-

-

... More
Ist class brick work in 1:4 CM with hamirpur corrse sand of F M not less than 2.0 including cost of all material,labour and T&P etc required for proper completion of work as per direction of Engineer-in-Charge.

56.74

-

-

... More
Centering & shuttering for RCC work including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

17.77

-

-

... More
Cutting, bending, binding& placing of steel reinforcement in proper position including cost of steel,bending wire, labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.

0.6

-

-

... More
Supply and Laying two coat bitumen painting with two layer tarfelt etc. required for proper completion of work as per direction of Engineer-in-Charge.

3.74

-

-

... More
Supply and fixing 20 mm thick joint filler board including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

3.32

-

-

... More
Laying R C C 1:1.5:3 (M-20) using 4.75 mm to 20 mm size crushed kabarai stone grit with hamirpur coarse sand having F M not less than 2.0 including cost of all material, labour and T&P except steel, required for proper completion of work as per direction of Engineer-in-Charge.

5.18

-

-

... More
Cement pointing in 1:2 (Deep struck) , 1 cement and 2 coarse sand F M not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

92.34

-

-

... More
Supply and fixing of wheel guard including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

4

-

-

... More
Earth work embankment in making ramp including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

228.75

-

-

... More
S O B brick on edge soling including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

225

-

-

... More
Earth work in removing road diversion including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

112.5

-

-

... More
Dewatering with all cost of power, P.O.L., machines ,pump,well point system and operator etc. with assembling and deassembling of machines etc.required for proper complection of work as per direction of Engineer-in-Charge. (a) Hiring charges of 5 HP deisel pum /gen. set including operator & P.O.L. for running hours.

80

-

-

... More
(b) Cost of 9.00 M Boring.

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.