If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Irrigation Work
Eprocure
Opening Date2 Dec 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone Boulder Pitching dismantling seepage toe drain & Toe filter of Lower Khajuri Dam Including Cost of all material, lead lift, Labour,T&P etc. Required for Proper Completion Work .

953.83

-

-

... More
P/L 200 mm Thick Coarse sand below seepage toe drain & toe filter Pitching of Lower Khajuri Dam with cost of material, labour, T&P, Taxes etc. required for proper completion of work.

279.09

-

-

... More
P/L of 200 mm Stone Gritt 4.75 to 20 mm below seepage toe drain & toe filter pitching of Lower Khajuri Dam with cost of material, labour, T&P, Taxes etc. required for proper completion of work.

279.09

-

-

... More
Relaying Boulder Pitching in seepage toe drain & toe filter of Lower Khajuri Dam Including Cost of all Labour,T&P etc. Required for Proper Completion Work

667.68

-

-

... More
Supply & Laying Stone Boulder Up to 20.00 Kg Pitching of seepage Toe drain of Lower Khajuri Dam Including Cost of all Labour ,Hammer Dressing ,T&P etc. Required for Proper Completion Work

76.97

-

-

... More
Supply & Laying Stone Boulder Up to 25.00 Kg Pitching of Toe Filter of Lower Khajuri Dam Including Cost of all Labour ,T&P etc. Required for Proper Completion Work

228.9

-

-

... More
Structural improvement works of weir

-

-

-

... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to crest level height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & luck system with M.S. tubes, M.S. tube challies, M.S clamp and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the work men etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made only once irrespective of duration of scaffolding.

3123.75

-

-

... More
Raking out the horizontal and vertical joints of mortor to a depth 5 cm of upstream face R R masonry in the outer face of the dam to remove all the loose and hard pointing including chiselling, wedging and removal of loose mortar,cleaning by air water jetting etc. complete (above water), (manual/and or mechanical means).

1465.65

-

-

... More
Racking out joints of brick/stone work in cement or lime mortar to a depth of 1 cm. including disposal of refuse as directed by the Engineer-in-charge within a distance of 60M.

3854.18

-

-

... More
providing and filling the pointing mortar in the horizontal and vertical joints of R R masonry in outer surface of the walls to a depth of 5 Cm and the repair morator shall be extended on ither side of the masonary joint i.e on the masonary block by 20 mm and for a thickness of 10-12 mm by applying a priming coat with epoxy bonding agent inside the joints with a brush and filling properly these joints with single component, fibre reinforced, sulphate resistant, non shrink, fibre reinforced, UV resistant, thixotropic, high performance CE Certified cementitious structural repair mortar conforming to EN 1504-3 Class R4 standards for masonry joint filling to a depth of 5 cm as per technical specification. Material must be CE certified and should have Compressive strength ≥ 55 MPa as per EN:12190,Chloride ion content≤ 0.05% as per EN:1015-17, Adhesive bond ≥ 2.0 MPa as per EN:1542,Carbonation resistance dk ≤ control concrete [MC(0,45)]as per EN:13295 & Elastic modulus ≥ 20.0 GPa as per EN:13412 complete asper specification including cost of all materials, machinery,labour transportationwith all leads and lifts and any other incidental charges as directed by the Engineer in charge. (Complete finished item with all leads and lifts).

1465.65

-

-

... More
Cement pointing (1:2) C.M of D/s weir and weir top Including Cost of all material, lead lift Labour, T&P etc. Required for Proper Completion Work.

3854.18

-

-

... More
Wet percussion drilling upto 75 mm dia. holes in open space for grouting or anchor etc. vertical or at specified inclination in masonry concrete or rock including flushing and routine washing of holes upto 30 minutes.

1254

-

-

... More
Special washing of holes, including cleaning flushing and all retated incidental works etc. complete.

104.5

-

-

... More
Grouting up to 75 mm dia holes with cement grout mix at required pressure, including cost of cement and maintenance of all technical records, Incidental works, materials etc. complete job.

5016

-

-

... More
Conducting percolation test drill holes at desired pressure including water supply arrangement and necessary accessories etc. complete as per Engineer-in-charge.

24

-

-

... More
Pack grout filling the internal porous cavities upto 1 metre deep in the RR masonry: Treating the internal cavities upto 1 metre deep in the masonry using injection pressure grouting to reduce the porosity of the masonry by drilling hole of 12.5 mm/25mm dia and 200mm deep and fixing PVC nozzles in triangular pattern. Minimum 3 nos of PVC nozzles shall be fixed per 1m2 of the upstream area for grouting. Grouting the deep cavities inside the masonry joint using cementitious grout slurry to be mixed with non shrink grout additives The performance of the material shall shall conform to ASTM C-1107.The specimen of the grout material shall have minimum 28 days compressive strength and Tensile adhesive strength not less than 34 MPa and of 10 MPa respectively @200gm per 50kg bag of cement under required consistency by using 40 psi grouting pump. The grouting material shall give a minimum compressive strength of 25N/mm2 in 28 days when cube tested. All works Complete using all relevant safety equipments

2110

-

-

... More
Coffer Dam And Dewatering Work

-

-

-

... More
Supplying and filling impervious soil (Mixed moorum) in constructing coffer dam, complete in all respect, including its cost, carriage to work site, lead beyond 2.00 Km and Up to 3.00 km From axis to C. G. Barrow area & lifts, whatsoever mechnical compaction, labour, all taxes, royalty and T&P charges required for proper completion of the work.

30579.6

-

-

... More
Running 5HP diesel pumps for dewatering, including suction and delivery pipe, with cost of labour including operator and POL etc complete in all respect, including all lead, lift and delift whatsoever with carriage and other T&P charges required for proper completion of the work, per hour .

13443

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.