If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date20 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 2,42,00,000
Costs
EMD
₹ 4,84,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_975193_1Tender No
NIT-05/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and fixing of thrust bearing for steel gate including cost of all material, labour and T&P etc.complete.
1
-
-
Glands /sleeves/chuck nut/ journal bearing without white metal including all labour,T&P etc.complete.Bronze IS : 318 Gr. 2 Spares
6.5
-
-
Threading and turning of 50 mm dia spindle rod including all labour,T&P etc.complete.
195
-
-
Suppllying and fixing GI pipe 75 mm dia including cost of all material, labour and T&P etc.complete.
1.35
-
-
Providing and fixing cap pipe hook (locking system) including cost of all material, labour and T&P etc.complete.
1
-
-
Supplying and fabrication of handle with 1" shaft including cost of all material, labour and T&P etc.complete.
1
-
-
Oiling and Greasing steel regulator gate including cost of all material, labour and T&P etc.complete.
1
-
-
Painting of steel regulator gate including cost of all material, labour and T&P etc.complete.
2.43
-
-
Carriage from workshop to site including cost of all material, labour and T&P etc.complete.(Hiring of Tractor 35 H.P and above with driver and P.O.L. with trolley.(Rs. 250 per hour maximum Rs. 2000/Day)
1
-
-
Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 meter BRICK WORK
118.31
-
-
Dismantling brick and cc work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 meter C.C. WORK
95.79
-
-
Laying soiling coat with brick ballast consolidation by hand ramming including opening out stacts sorting in ballast in to size including carriage of material 30 meter and cariage of water 200 m. including all T & P required for proper completion of work
82.82
-
-
Laying C.C. 1:1:2 with 10-20 mm size stone grit in wearing coat incl. all cost of labour, material & T&P etc
14.46
-
-
Providing and laying Cement concrete (1:1.5:3) with cement , coarse sand , and 10mm to 20mm stone grit including cost of all material, labour and T&P etc.complete.
140.91
-
-
Providing and laying Cement concrete (1:2:4) with cement , coarse sand , and 10mm to 20mm crushed stone grit including cost of all material, labour and T&P etc.complete.
128.12
-
-
Providing and laying Cement concrete (1:3:6) with cement , coarse sand , and 20mm to 40mm crushed stone grit including cost of all material, labour and T&P etc.complete.
297.43
-
-
Centering and shuttering for CC work including cost of all material labour and T&P etc.complete.
2315.22
-
-
Centering & shuttering for RCC work including all cost of labour material T&P
239.98
-
-
12.5mm thick cement plaster in 1:6 cement ,fine sand including cost of all material, labour and T&P etc. complete.
2311.8
-
-
Struck deep cement pointing in 1:2 on brick masonary including cost of all material labour T&P etc as per direction of engineerIn charge
592.13
-
-
Hiring 5HP diesel pump including operator and P.O.L.
228
-
-
Cutting of behya / sarpat / gondi / elephant grass and other weeds and its disposal
1680
-
-
Uprooting of Behya /Sarpat/ Gondi/ elephanta grass and other weed and its disposal.
58800
-
-
Supplying & placing steel reinforcement in position inc. cutting, bending & binding.
11.85
-
-
Earth work excavation in foundation including lead up to 30m and lift up to 1.5m including back filling and dressing etc.complete.
1538.25
-
-
Earth work in excavation with saturated soils including lead up to 30m and lift up to 1.5m including dressing and making profile etc.complete.
425.01
-
-
Earth work in Road Diversion/By pass & Ramp's including all cost of labour, material & T&P
1621.5
-
-
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :900 mm dia RCC pipe
60
-
-
Removal of Road Diversion/By pass including all cost of labour, material & T&P
1206.96
-
-
Removal of NP-2 RCC Hume pipe from road Diversion
60
-
-
Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
491.62
-
-
12.5 mm thick cement plaster in 1:3 cement coarse sand on Structure including cost of all material, labour and T&P etc. complete.
433.8
-
-
Brick on edge soling (Dry) incl. all cost of material labor & T&P
6590.63
-
-
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of all material, labour and T&P etc. complete.
2319.14
-
-
Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
661.74
-
-
S/F 75 mm dia hume pipe
19.5
-
-
S/F 100 mm dia hume pipe
106
-
-
S/F 125 mm dia hume pipe
117
-
-
S/F 150 mm dia hume pipe
86.5
-
-
Dewatering for execution of work i/c cost of all material labour T&P wtc for completion of work Hiring 5HP diesel pump including operator & P.O.L.
447
-
-
Supplying and Fixing of Tarfelt between Slab and Bedblock incl. all cost of material labor & T&P.
30.74
-
-
Supply and fixing Angle Iron 50x50x5 on joint as per direction of engineer In charge including cost of all material labour & T&P
144
-
-
Supply and fixing of signboard as per direction of engineer In charge including cost of all material labour & T&P
6
-
-
Supplying & Fixing wheel gaurd stone of size 200x200x750mm at VRB with cement, approved coarse sand having FM not less than 2 and 2 cm gauge approved stone ballast conforming to M20(1:1.5:3) grade concrete including upply of reinforcement and bending the same with 24 BWG winding wire and necessary centering and shuttering etc. and also including supply of all materials and tools and plants etc. required for proper completion of work.
24
-
-
Writing letter on parapet wall including supply of all material labour and t&p etc. required for proper completion of the work.
3080
-
-
I Shaped precast RCC pillar
206
-
-
Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete.
2542.98
-
-
Painting on Top of sleeper with (Bitumen s-35 (60/70) or s90 (180/100) grade @ one kg /sqm including cost of all material, labour and T&P etc. complete.
408.89
-
-
Providing and laying 60 mm thick C.C. ,M-15 (1:2:4) lining excluding centering and shuttering, including cost of all material ,labour and T&P etc. complete.
2311.8
-
-
Making construction joint in lined concrete surface as per drawing ,including painting with sealing primer and joint filling with sealing compound, including cost of all material ,labour and T&P etc. complete.
544.43
-
-
Earth work in correcting internal section of canal by hydraulic excavator (Poclain/ JCB) with side slope cutting at required slope including all lead & lift in all type of soil with proper disposal, compaction and dressing of bank and daula as directed by site in charge.
13854.05
-
-
Earth work in filling with ordinary soils including lead up to 1km and lift up to 1.5m including dressing and manual compaction etc.complete.
16426.87
-
-
Earth work in Gravity Guls/Tube Well Guls with proper dressing and
compaction.
1832
-
-
Finshing wall in two coats with water proofing cement paint of premium quality approved make such as super snowcem, durocem, supercem, quilaty of required shade on new wall surface (two coat) over one coat of white cement primer to give and even shade after thoroughly brushing the surface to remove powdered materials including curing and cost of all materials.
1271
-
-
Material testing ( Brick, Cement & Aggregate)
3
-
-
Testing of Material (steel, Cement & Aggregate)
2
-
-
Testing of Material (Cement & Aggregate)
7
-
-
Testing of Material (Brick, Steel, Cement & Aggregate)
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%