Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Bridge Construction
Civil And Construction
Eprocure
Opening Date27 Feb 2024
Closing Date4 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,90,000Document Cost
₹ 8,614Tender Fee
Refer Documents
Summary
Construction Of Box Culvert In Place Of V.r.b. At Km 46.850 On D.s.p
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_899828_3Bid Award Id
ViewTender No
08/S.E./2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
1153.71
-
-
... More
Laying C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
153.26
-
-
... More
Reinforcement including carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc. all complete.
37.51
-
-
... More
Centering and shuttering for P.C.C. work in foundation including all cost of materials,T&P labours and other accessories required for proper completion of work.
207.59
-
-
... More
Centering and shuttering for P.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
696.45
-
-
... More
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
798.48
-
-
... More
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
489.71
-
-
... More
Laying R.C.C. work in 1:1:2 sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for box culvert and wearing coat including all cost of materials,T&P and labours and other accessories required for proper completion of work, excluding cost of reinforcement. In the direction of Engineer-in-charge as per drawing and I.D. specification.
483.59
-
-
... More
Laying C.C. work in 1:2:4 sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for box culvert and wearing coat including all cost of materials,T&P and labours and other accessories required for proper completion of work, excluding cost of reinforcement. In the direction of Engineer-in-charge as per drawing and I.D. specification.
390.29
-
-
... More
Supplying and laying PVC Pipe in abutment 50mm dia including material, labour,T&P etc. complete work directed by Engineer-in-charge.
14
-
-
... More
Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. complete work approved by Engineer-in-charge as per drawing and I.D.specification.
84
-
-
... More
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc. complete work approved by Engineer-in-charge as per drawing and I.D.specification.
528
-
-
... More
Earth work in removing of diversion bund and correction of bank including cost of labour and T&P with proper completion of work approved by Engineer-in-charge as per drawing and I.D. specification.
2048.29
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements