Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date21 Sep 2024
Closing Date14 Oct 2024
Tender Amount₹ 3,80,000
Costs
EMD
₹ 7,600Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_957381_6Tender No
01/EE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying CC A20-M15 in foundation of structures with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (20-40 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & mechanical vibration including cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc.
7.4
-
-
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete on concrete work. Colour scheme should be as per directions of engineer-in-charge.
11.86
-
-
Painting two coat of synthetic enamel paint on new surface with superior quality of approved make including cost of all material labour T&P etc. required for proper completion of work. Colour scheme should be as per directions of engineer-in-charge.
246.29
-
-
First class bricks work in 1:4 cement mortar with sand of 2.0 F.M. including cost of all material, lead, lift labour, and T&P etc.
1.76
-
-
Cement pointing in 1:2 (flush) cement mortar with sand of 2.0 F.M. on exposed surface of brick masonry including cost of all material, lead, lift labour, and T&P etc.
11.86
-
-
Brick work 1:3 in lining 160 mm thick (double layer) including 10 mm mortar underneath including cost of material and labour etc. required for proper completion of work as per directions of Engineer-in-charge.
170.99
-
-
Providing and fixing 1000 MM dia hume pipe of 2.5 m length including cost of all T.& P., labour etc. required for proper completion of work as per directions of Engineer-in-charge.
4
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of
material and labour etc. required for proper completion of work as per directions of Engineer-in-charge.
70.7
-
-
Supplying and fixing EPDM U channel edge seal strip (1.6mm) including cost of all T.& P., labour etc. required for proper completion of work as per directions of Engineer-in-charge.
4
-
-
Supplying and fixing EPDM rubber sheet commercial grade 60A 3mm thick, 1.2m wide including cost of all T.& P., labour etc. required for proper completion of work as per directions of Engineer-in-charge.
4
-
-