Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Eprocure
Opening Date12 Sep 2024
Closing Date25 Sep 2024
Tender Amount₹ 1,33,75,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and Shuttering for R.C.C work including cost of Centering & Shuttering including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

524.59

-

-

... More
R.C.C in 1:1.5:3 cement. Coarse sand and Stone Grit 6 to 12 mm also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

377.37

-

-

... More
Laying C.C in 1:1:2 cement. Coarse sand and Stone Grit 6 to 12 mm also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

220

-

-

... More
Mild steel of T.M.T Bars in Reinforcement Cement Concrete work to required shape as necessary including cost of Binding wire & bending for proper completion of the work and including supply of all steel and wastages and over lapping and hooks also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

539.73

-

-

... More
Class 10 / M-100 brick work in 1:6 cement and sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

19.38

-

-

... More
Sand filling in plinth under floors including Supply of necssary quantity of sand fron a distance not exceeding 8km from the site of work & including watering, dressing etc. Rate includes cost of all materials, labour and T&P etc. required for proper completion of the work.

4.33

-

-

... More
Class 10 / M-100 brick work in 1:4 cement and sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

14.9

-

-

... More
Cement plaster 1:4 on Brick masonery with cement sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

175.35

-

-

... More
25 mm thick D.P.C. in C.C. 1:2:4 with cement, coarse sand & grit 6 to 12 mm size including water proofing compound in the proportion as specified by the manufacturers including cost of all materials, labour, T&P etc. complete

5.52

-

-

... More
Painting in D.P.C. with two coat of airblown bitumen 85/50 or 85/25 @ about 1.7 kg/ sqm including cost of fuel if any also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

5.52

-

-

... More
Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular/ L-Type sections, made of 1.60 mm thick M.S. Sheet, joints mitred, welded and grinded finish, with profiles of required size, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

75.77

-

-

... More
Providing and fixing ISI marked flush door shutters conforming to IS :2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws

5.41

-

-

... More
Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joint with white cement & matching pigments etc. complete.

10.8

-

-

... More
Finishing walls with water proofing cement paint of approved made such as super snowcem, Durrocem, Robiacem Guttucem, supermen quality of required shade on uncoated wall surface (two coat) over one coat white cement primer to give even shades after throughly brushing the surface of remove all dirt and remains of loose powdered material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

280.29

-

-

... More
Mild steel or iron work of small section such as holding dorn bolts, hold fast, tie roads, grantings etc. wrought to required form, including of supply of steel, bolts, nuts, wastage and fixing also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

6.93

-

-

... More
Two coat painting over priming coat including cost of ready mix primer on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stooping, paint shall be used as per standard I.S. specification also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

25.2

-

-

... More
Earth work in embankment by power tranported earth with all lead and lifts including excavation, loading, unloading, manual compaction, dressing complete excluding royalty will be applicable from time to time on Govt. orders also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

4676.8

-

-

... More
Supply and fixing of 12.5 mtr High mast Pole of approved make with rising system, hot dip Galvanized inside & outside , having pole sheet thickness 3mm, top minimum100mm, bottom dia minimum 310mm, base plate 25mm thick, suitable for wind velocity as per IS 875 part 3. & having no circumferential weld, with accessories for high mast such as head frame suitable for 6 luminaries & its control gear boxes,0.75 HP Power tool motor, 3 point suspension system with steel wire rope 6mm dia , double drum winch Including making suitable Foundation as per manufacture drawing & site requirement along with foundation bolts, nuts, washers , anchor plates etc Complete in all respect. as per direction and satisfaction to the Engineer-in-charge.

1

-

-

... More
Supply and fixing of LED Street light Fitting having die cast aluminium body and diffuser with driver set suitable for 52 watt to 72 Watt. Confirming to IP65 and above Protection complete also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

22

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.