Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date16 Aug 2024
Closing Date24 Aug 2024
Tender Amount₹ 5,92,52,000
Costs
EMD
₹ 11,85,040Document Cost
₹ 7,354Tender Fee
Refer Documents
Summary
Construction Work Of Cross Regulator At Km. 28.500 Of Mat Branch.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_944519_6Bid Award Id
ViewTender No
04/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
P/L C.C M25 (1:1:2) (CEMENT,COARSE SAND AND STONE AGGREGATE OF SIZE 10 TO 20 MM) I/C ALL COST OF MATERIALS, LABOUR AND T & P
143.06
-
-
P/L. R.C.C M25(1:1:2) (CEMENT,COARSE SAND AND STONE AGGREGATE OF SIZE 10 TO 20 MM) I/C ALL COST OF MATERIALS, LABOUR AND T & P
1367.82
-
-
P/L Crushed Stone Agg. 10 to 25 mm. for Filter I/C ALL COST OF MATERIAL, LABOUR T&P ---ETC COMPLETE.
127.04
-
-
P/L STONE BOULDER 20-40 KG WT IN PITCHING IN SIDE SLOPE I/C LABOUR AND T&P
445.98
-
-
P/L STEEL REINFORCEMENT FOR RCC WORK I/C CUTTING,BENDING, BINDING & PLACING I/C ALL COST OF MATERIAL,LABOUR, T&P-----
114.27
-
-
CENTERING AND SHUTTERING FOR C.C. WORK I/C ALL COST OF MATERIAL,LABOUR AND T&P
1713.43
-
-
CENTERING AND SHUTTERING FOR R.C.C. WORK I/C ALL COST OF MATERIAL,LABOUR AND T&P
1582.82
-
-
S/F 20MM TH BITUMIN FILLING IN EXPANSION JOINT BETWEEN RCC SLAB I/CALL COST OF MATERIAL LABOUR, T&P
127.86
-
-
DISMENTALLING 100 YEARS OLD BRICK MASONARY OF MAIN CANAL DAMAGED VRB & DISPOSAL SCOUR BEDWITH IN 60 M DISTANCE
569.55
-
-
S/F. E.C.BAGS WITH EARTH AND PLACING WITH IN 60 M LEAD FOR MAKING BUNDH I/C ALL COST OF MATERIAL,LABOUR,T&P
55556
-
-
E/W IN REMOVE AND DISPOSAL OF BUNDH ,BANK, RAMP AND APPROACHWAY I/C LIFT UP TO 1.5 M & LEAD 500 M I/C ALL COST OF MATERIALS, LABOUR AND T&P
7600
-
-
SURFACE DEWATERING BY 7.5 HP DIESEL PUMP SET FOR CONSTRUCTION WORK ASSUME 20 HRS AVERAGE /DAY FOR 25 DAYS FOR WORK-
4000
-
-
S/F HOT ROLLED SHEETPILE/MT AS NEAR TO IS CODE SECTION Z 24-700 UP TO 5 M HEIGHT I/C ALL COST OF MATERIAL, LABOUR AND T&P ETC COMPLETE.
82.84
-
-
SUPPLYING/LAYING 110 MM DIA P.V.C.PIPE FOR WEEP HOLES
89.6
-
-
E/W IN FILLING FOR STRENGTHENING OF BANKS I/C LIFT UP TO 1.5 M AND LEAD 30.00 M. I/C RAMMING,DRESSING
1550
-
-
P/F IRON GATES I/C ALL MATERIALS,LABOUR,T & P
90.31
-
-
COLOUR WASHING TWO COATS INCLUDING THE COST OF ALL MATERIALS, LABOUR AND T&P ETC COMPLETE THE WORK.
241.8
-
-
S/F SIGN BOARD SIZE (0.90X0.60) -ETC COMPLETE.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements