Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date5 Feb 2025
Closing Soon12 Feb 2025
Tender Amount₹ 33,50,000
Costs
EMD
₹ 67,000Document Cost
₹ 1,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_1002235_6Tender No
TN-07/EE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches.
659.68
-
-
... More
Plain cement concrete 1:4:8 nominal mix in foundation with natural sources aggregate 40 mm nomonal size.
29.53
-
-
... More
Provinding concrete for Plain Cement Concrete M-10 ( 1:3:6) in open foundations complete as per Drawing ;
86.59
-
-
... More
Brick Masonry work in Cement Mortar 1:4 in Foundation/Above complete excluding pointing & plastering as per Drawing .
209.99
-
-
... More
Provinding concrete for Plain Cement concrete M-20 ( 1:1.5:3)in open foundations/Slab complete as per Drawing .
20.15
-
-
... More
Provinding concrete for Reinforced Cement concrete M-20 ( 1:1.5:3)in open foundations/Slab complete as per Drawing .
47.68
-
-
... More
Supplying , Fitting and placing HYSD Bar Reinforcement in Foundation Slab Complete as per Drawing .
4.19
-
-
... More
Pointing with Cement Mortar 1:3 on Brick Work as per Drawing and Technical Specification.
170.48
-
-
... More
Supplying and laying one layer of Tar felt I.S.I. marked over roof as per direction of the Engineer-in-charge including necessary overlep giving a coat of approaved mastic paint on the bottom and top of Tar felt spreading of necessary quality of approved coarse sand or small bajri and including supply of all materials, labour, Tools and plants etc. required for proper completion of work.
14.28
-
-
... More
Providing and laying Thermacol sheet in expention joint including cost of all material, T&P and labour per SqM.
10.07
-
-
... More
Providing and fixing P.V.C. pipe 75mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc.
3.76
-
-
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.50 m , transporting to site,spreading, grading to required slope and ramming & dressing with a lead up to 1000 m .
651.41
-
-
... More
Earthwork in Cutting Making Diversion for continuos running of water during work i/c back filling and Removing bandhas etc complete.
616.43
-
-
... More
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN etc.
37.5
-
-
... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing .
46.32
-
-
... More
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings .
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user