Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date30 Jul 2018
Closing Date8 Aug 2018
Tender Amount₹ 13,46,000
Costs
EMD
₹ 26,920Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPIDC_234237_15Bid Award Id
ViewTender No
02/M.G.C.C.D-8/2018-19Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying (M-150) Brick on flate side slope laid in cement mortar 1:6 and poured with 1:2 CM mortar i/c preparation of base to proper slope and its ramming i/c all material,labour,T&P etc. required for proper completion of work.
91.2
-
-
... More
Laying (M-150) Brick on edge on Approach Road Laid Dry Joints sand Filled i/c preparation of base to proper slope and its ramming i/c all material,labour,T&P etc. required for proper completion of work.
120
-
-
... More
Laying graded Sand filter in two coats in 150 mm thickness including cost of all materials, labour, T&p, etc. required for proper completion of work. Execluding cost of dewatering.
14.4
-
-
... More
Laying 100 mm thick cement concrete with 4 cm gauge approved stone ballast coarse sand , cement in proportion 4:2:1 including cost of all materials, labour, T&p, etc. required for proper completion of work.
9.89
-
-
... More
P/L Stone Boulder pitching in launching apron including cost of all materials, labour, T&p, etc. required for proper completion of work.
29.7
-
-
... More
12 mm thick Cement plaster in 1:4 CM on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
21.77
-
-
... More
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
129.39
-
-
... More
Laying CC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
15.33
-
-
... More
Laying RCC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
19.86
-
-
... More
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
3.72
-
-
... More
P/F 75 mm dia P.V.C.pipe in proper position for drainage spout i/c all material labour T&p etc. required for proper completion of work.
4
-
-
... More
Struck deep cement pointing in 1:2 CM on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
291.71
-
-
... More
Painting of Bitumen (85/40 grade) two coats on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
19.36
-
-
... More
Providing and Laying two coats of tar felt on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
6.94
-
-
... More
Providing and Fixing expension joint with angle iron 75x75x10 mm size, with M.S. Flate 32x6 mm filled with bitumen and stone dust including cost of all materials, labour, T&p, etc. required for proper completion of work.
16.52
-
-
... More
Earth Work in Fiiling or in embankment in ordinary soil, Excavation to be in the form of regular pits and earth work in embankment to be in 20 mm layers including ramming and dressing the surface to be required levels and slopes i/c all lift & lead up 1.00 km. complete as per direction of Engineer-in-Charge.
108
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements