Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date22 Sep 2023
Closing Date29 Sep 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing local sand including cost of all material ,labour and T&P etc complete in all respects.

368.45

-

-

... More
Providing & Laying of C.C. in 1:3:6 in base with cement ,coarse sand of F.M. more than 2.2 & 25 mm to 40 mm size stone ballest including cost of all material , labour and T.&P. etc required for proper completion of work.

538.88

-

-

... More
Providing and Laying C.C. in 1.1.5:3 with cement coarse sand of FM not less than 2.00 and 4.75 mm to 20 mm size hard stone dala grit including cost of all material, labour and T&P etc.

49.04

-

-

... More
Stone masonry work in 1:3 in with cement , coarse sand of F.M. more than 2.2 & stone khanda 200x200x200 mm size including cost of all material , labour and T.&P. etc required for proper completion of work.

1156.42

-

-

... More
Stone masonry work in 1:3 in with cement , coarse sand of F.M. more than 2.2 including cost of all material but excluding cost of stone khanda , labour & T.&P. etc required for proper completion of work.

34.69

-

-

... More
Supplying & Laying of stone boulder on internal slope of canal including cost of all material , labour and T&P. etc required for proper completion of work

204.07

-

-

... More
Relaying of stone boulder including cost of all material , labour and T&P. etc required for proper completion of work.

121.79

-

-

... More
Cement Pointing in 1:2 CM on stone masonry including cost of all material labour T&P. required for proper completion of work.

4729.46

-

-

... More
Centering and shuttering for RCC work including cost of all material ,labour and T&P. etc. required for proper completion of work.

139.64

-

-

... More
Providing and Laying R.C.C in 1.1.5:3 with cement coarse sand of FM not less than 2.00 and 4.75 mm to 20 mm size hard stone dala grit including cost of all material, labour T&P etc. complete in all respect

59.93

-

-

... More
Cutting ,bending ,binding and placing of reinforcement including cost of all material, labour and T&P. etc . required for peoper completion of work.

5.69

-

-

... More
Distempering two coats of oil bound distemper including cost of all materials ,labour T&P etc required for proper completion of work.

150.96

-

-

... More
E/w in excavation/ cutting in canal section with all type of soil with initial lead and lift and levelling & dressing complete in all respects.

122.3

-

-

... More
Earth work in filling in canal patari, dawla and bank including cost of all lead, lift, labour, T&P, with transported soil with lead up to 1.0 km. complete in all respects. (a) With initial rate

449.88

-

-

... More
With transported soil

39435.33

-

-

... More
Providing and fixing boundry piller including all cost of labour ,T&P etc.Required for proper completion of work.

140

-

-

... More
Providing and fixing km piller including all cost of labour ,T&P etc.Required for proper completion of work.

14

-

-

... More
Supplying and fixing of 150 mm R .C. C. outlet pipe icluding cost of all labour, material and T & P, required for proper completion of work.

820

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.