Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date18 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 88,90,000
Costs
EMD
₹ 1,78,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Summary
Construction Of Vrb At Km. 5.640 Of Baikunthpur Rajwaha In District Mahrajganj.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_974560_4Tender No
Tender Notic 07/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Laying C.C.A20 - M-15 with cement, coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
86.98
-
-
Laying C.C.A20 - M-25 with cement, coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
209.15
-
-
Laying C.C.A20 - M-20 with cement, coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
71.94
-
-
S/L P-Gravel in graded filter below weep hole required for proper completion of work including cost of labour, T&P etc.
0.45
-
-
S/L coarse sand in graded filter below weep hole required for proper completion of work including cost of labour, T&P etc.
3.14
-
-
S/L Fine sand in graded filter below weep hole required for proper completion of work including cost of labour, T&P etc.
8.51
-
-
Laying & fixing Joint Filler Board 18m thick at specified location in structure required for proper completion of work including cost of all material, T&P & labour etc.
19.29
-
-
Dry Brick on edge soling including prepration of subgrade and filling joints with local earth required for proper completion of work including cost of all material, T&P & labour etc.
759
-
-
laying brick ballast 20mm to 40mm size below lining required for proper completion of work including cost of all material, T&P & labour etc.
9.86
-
-
E/W in Making Ramp and road diversion in all types of soil with all leads & lifts including and dressing including cost of T&P & labour etc required for proper completion of work.
1871.25
-
-
E/W for removing of road diversion in all types of soil including all leads, lifts and proper disposal of earth as per direction of E/I including cost of T&P & labour etc required for proper completion of work.
1500
-
-
S/F Drainage spout pipe 100mm dia in R.C.C. slab for proper complition of work including cost of all material, labour T&P etc.
6
-
-
Providing expansion joint in R.C.C. including placing of angle iron & M.S. Plate and filling sealing compound as per drawing required for proper completion of work, including cost of all material, labour etc.
13
-
-
Dismanting Brick on Edge Soling on diversion including stacking required for proper completion of work with cost of all material labour and T&P etc.
660
-
-
Resoling dismantled Brick from diversion to ramp including required for proper completion of work with cost of all material labour and T&P etc.
396
-
-
Supplying and laying 75 mm dia P.V.C. pipefor weep hole at required locations in structures required for proper completion of work. Including cost of all materials labour T&P etc.
28
-
-
Brick work in 1:4 for end pitching with first class bricks, cement & coarse sand of FM not less than 2 required for proper completion of work including cost of all material, T&P & labour etc.
20.21
-
-
Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work..
29362.56
-
-
E/W in constructing canal manually or by tractor in all types of soil including all leads, lifts and proper disposal of earth as per direction of E/I including cost of T&P & labour etc required for proper completion of work.
2763.6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%