Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Mar 2025
Closing Soon8 Mar 2025
Tender Amount₹ 8,68,50,000 
Notes
Download

AI Insights

Bid Capacity
... View More
The bid capacity required in the given tender to bid having value and formulas is calculated using the formula: 2AN - B > Estimated cost of works. Where: - A = Maximum Value of Civil Engineering works executed in any one year during the last Five years (updated to Current Financial Year price level) - N = Number of years prescribed for completion of the works for which tenders are invited (period up to 6 months to be taken as half-year and more than 6 months as one year) - B = Value of existing commitments, works under consideration, work tendered for and ongoing works to be completed during the period of completion of the project for which tenders are invited. Additionally, the bid capacity is also mentioned in the SCHEDULE "F" DETAILS OF PLANT AND EQUIPMENT IMMEDIATELY AVAILABLE WITH THE TENDERER FOR USE IN THIS WORK, which includes various equipment with their respective capacities.
Technical Capacity
... View More
The bidder should have executed similar civil work, with experience of having successfully completed similar nature civil works during the last 7 years. The required prior work experience for the bidder includes: - Three similar nature works costing not less than 40% of the estimated cost put to the tender. - Or two similar nature works costing not less than 50% of the estimated cost put to the tender. - Or one similar nature work costing not less than 80% of the estimated cost put to the tender. The values are updated by giving 8% simple weightage per year to bring them to the current financial year price level. The work experience certificate should not be issued below the rank of Executive Engineer. The bidder should provide details of personnel with the contractor/firm for the work, including their designation, name, qualification, and professional experience, and submit a certificate of actual work done in the amount of ongoing works, issued by an officer not below the rank of Executive Engineer.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge.

1246.68

-

-

... More
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.

8590

-

-

... More
Earth Work in cutting in foundation of Box culvert/Guide wall on s including lead upto 30 M and lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge.

7191.77

-

-

... More
Laying Plain Cement Concrete (M-10) in foundation 1:3:6 with stont grit including cost of material, labour, T&p etc, complete.

825.55

-

-

... More
Laying Reinforced Cement Concrete (M25) in foundation 1:1:2 with stont grit including cost of material, labour, T&p etc, complete.

2662.83

-

-

... More
Bending,Binding,Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.

278.34

-

-

... More
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.

11384.27

-

-

... More
Providing & Fixing 110 mm dia PVC drainage spout/weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing

232.6

-

-

... More
Laying Plain Cement Concrete (M-20) in foundation 1:1.5:3 with ston grit including cost of material, labour, T&p etc, complete.

1786.76

-

-

... More
Providing & Fixing 75 mm dia PVC drainage spout/weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing

387.6

-

-

... More
Providing & Fixing Bitumen Joint filer Board For Expansion Joints.

228.63

-

-

... More
Earth Work in making Canal section and Removing diversion including cost of all lead lift, dressing and manual compaction etc.

3013.25

-

-

... More
Earth Work in making Canal section and Removing bund including cost of all lead lift, dressing and manual compaction etc.

7563.35

-

-

... More
Supply of Cement Bags made from polypropelane of not less than 70 GSM without contractor profit. Old and used without any cuts.

12500

-

-

... More
Demolishing Lime Concrete Work manually/by mechanical means and disposal of material within 50 meters lead as per direction of Engineer-in-Charge

387.24

-

-

... More
Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with stone grit including cost of material, labour, T&p etc, complete.

218.74

-

-

... More
Laying P.C.C. M-15 in C.C. Block (600 mmX600mmX300 mm) with cement coarse sand of F.M. not less than 2.00 and granite crushed stone grit (20-40 mm size) including lead upto 30 m lift upto 1.5 m mechanical mixing & mechanical vibrator including centring and shuttering required for proper completion of work including cost of materials, labours, T&P, etc.

222.29

-

-

... More
Supply and laying Coarse sand 150 mm thick of F.M. not less than 2.00 in graded filter as required for proper completionn work including cost of labour, T&P etc.

111.14

-

-

... More
Supply and laying Stone grit 150 mm thick 4.75 to 20mm size in graded filter as required for proper completionn work including cost of labour, T&P etc.

111.14

-

-

... More
Supply and laying Stone grit 150 mm thick 20 to 40mm size in graded filter as required for proper completionn work including cost of labour, T&P etc.

110.9

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.