Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Excavation
Irrigation Work
Eprocure
Opening Date19 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 7,90,00,000
Costs
EMD
₹ 15,80,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_964742_2Bid Award Id
ViewTender No
NIT-03/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing of thrust bearing for steel gate including cost of all material, labour and T&P etc.complete.
16
-
-
... More
Glands /sleeves/chuck nut/ journal bearing without white metal including all labour,T&P etc. complete. Bronze IS : 318 Gr. 2 Spares
104
-
-
... More
Threading and turning of 50 mm dia spindle rod including all labour,T&P etc.complete.
2955
-
-
... More
Suppllying and fixing of GI pipe 75 mm dia including cost of all material, labour and T&P etc.complete.
19.95
-
-
... More
Providing and fixing cap pipe hook (locking system) including cost of all material, labour and T&P etc.complete.
16
-
-
... More
Supplying and fabrication of handle with 1" shaft including cost of all material, labour and T&P etc.complete.
16
-
-
... More
Oiling & Greasing steel regulator gate including cleaning of spindle rod, chuck nut and locking system, with mobile oil, grease, kerosene, cotton, labour T&P etc.
16
-
-
... More
Painting of gates and appurtenances by applying 1 coat of red oxide zinc chromate primer and 2 coat of high build black bituminous paint of standard make after proper cleaning, scraping the surface including cost of all material, labour and T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work.
55.26
-
-
... More
Hiring of Tractor 35 H.P and above with driver and P.O.L. with trolley. (Rs. 250 per hour maximum Rs. 2000/Day). (For carriage of gates from workshop at fatehpur to the site from km 0.000 to km 37.100 including all lead & lift.Taking 08 hours for loading,transporting & unloading of 02 gates from workshop to site as one job.)
8
-
-
... More
Dismantling brick work, stone work in cement mortar including stacking of materials as directed by engineer in-charge within a distance of 60 m.
54.73
-
-
... More
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m.
76.83
-
-
... More
C.C works with cement & coarse sand having FM not less than 2 and crushed of 10 to 20 mm stone ballast conforming to M25(1:1:2) grade of concrete excluding supply of reinforcement and bending the same with 24 BWG winding weir and necessary centering and shuttering etc. including supply of all materials and t&p etc. required for proper completion of work.
16.47
-
-
... More
Reinforced cement concrete work excluding the cost of centering, shuttering in 1:1.5:3(1cement : 1.5 coarse sand having FM not less than 2 : 3 graded stone aggregate 10-20 mm size) as per direction of Engineer in-charge.
135.3
-
-
... More
Placing cement concrete in (1:2:4) with cement , coarse sand having FM not less than 2 , and 10mm to 20mm crushed stone grit including cost of all material, labour and T&P etc.complete.
583.97
-
-
... More
Placing Cement concrete in (1:3:6) with cement , coarse sand having FM not less than 2 , and 20mm to 40mm crushed stone grit including cost of all material, labour and T&P etc.complete.
206.08
-
-
... More
Centering & Shuttering for R.C.C. work in slab, beam, column of building work etc.
1362.53
-
-
... More
Centering & Shuttering for R.C.C. work including cost of materials (b) For bridge slab above 3m Span & up to 5m span.
384.43
-
-
... More
12.5 mm thick cement plaster in 1:4 cement coarse sand having FM not less than 2 on Structure including cost of all material, labour and T&P etc. complete in all respect.
1219.08
-
-
... More
12.5mm thick cement plaster in 1:6 cement ,fine sand including cost of all material, labour and T&P etc. complete.
18254.56
-
-
... More
Uprooting of Behya/Sarpat/Gondi/elephanta grass and other weed and its disposal.
836938.68
-
-
... More
Supplying and placing of steel bars/reinforcement including cutting, bending, binding and placing at site including cost of wire, all material, labour and T&P etc.complete.
11.76
-
-
... More
Earth work excavation in foundation including lead up to 30m and lift up to 1.5m including back filling and dressing etc.complete.
1335.94
-
-
... More
Earth work in correcting internal section of canals by hydraulic excavator (poclain / JCB) with side slope cutting required slope including all type of soil ,including cost of all material, labour and T&P etc.complete.
23559.08
-
-
... More
Earth work in making of road diversion/by pass & ramp's including cost of all material,labour,lift & lead t&p etc. complete in all respect.
837.43
-
-
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :900 mm dia RCC pipe For Road diversion & Syphon
105
-
-
... More
Earth work in removal of road diversion/by pass & ramp's including all cost of lead, lift,labour, t&p etc. complete.
666.7
-
-
... More
Removal of NP-2 RCC Hume pipe from road Diversion 900 mm dia.
90
-
-
... More
Brick work in 1:4 cement mortar with cement , coarse sand having FM not less than 2 , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
396.1
-
-
... More
12.5 mm thick cement plaster in 1:3 cement coarse sand having FM not less than 2 on Structure including cost of all material, labour and T&P etc. complete.
871.5
-
-
... More
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per technical specification clause 412.
14323
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
2356.95
-
-
... More
Supplying & Fixing wheel gaurd stone of size 200x200x750 mm at VRB with cement, approved coarse sand having FM not less than 2 and 2 cm gauge approved stone ballast conforming to M20(1:1.5:3) grade of concrete including supply of reinforcement and bending the same with 24 BWG winding wire and necessary centering and shuttering etc. and also including supply of all materials and tools and plants etc. required for proper completion of work.
36
-
-
... More
Hiring 5HP diesel pump including operator & P.O.L.
1054
-
-
... More
Supply and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any place as per direction of Engineer-in-Charge including necessary overlap, giving a coat of approved plastic paint below the tarfelt including supply of all materials, and T&P required for proper completion of the work.
27.53
-
-
... More
Writing letter above 50 mm but below 80 mm size.
6160
-
-
... More
Supplying & Fixing I Shaped precast RCC boundary pillar of size 6"x6" with cement, approved coarse sand having FM not less than 2 and 10-20 mm graded stone ballast conforming to M20(1:1.5:3) grade of concrete.
372
-
-
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :100 mm dia RCC pipe.
391
-
-
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :150 mm dia RCC pipe.
391
-
-
... More
Earth work in canals with manual labour including compaction and dressing for the following discharges.(b) 10 to 5 cumec.
4139.68
-
-
... More
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of all material, labour and T&P etc. complete.
1825.64
-
-
... More
Supply of LDPE Film 200 micron of 1st grade including all taxes and contractor profit confirming to IS Code 2508-1984 Reaffirmed to 2003.
23364.61
-
-
... More
Painting on Top of sleeper with (Bitumen s-35 (60/70) or s90 (80/100) grade @ one kg /sqm including cost of all material, labour and T&P etc. complete.
3102.77
-
-
... More
Providing and laying 75 mm thick C.C. of M-15 grade (1:2:4) lining excluding centering and shuttering, including cost of all material ,labour and T&P etc. complete.
21240.55
-
-
... More
Shuttering work for 75 mm thick lining, sleeper & patara of plain cement concrete including cost of material, labour, T&P, fixing and removal etc.
5396.96
-
-
... More
Making contraction groove in lined concrete surface as per drawing ,including painting with sealing primer and joint groove filling with sealing compound, including cost of all material ,labour and T&P etc. complete.
3186.08
-
-
... More
Providing and applying tack coat with Bitumen VG-10 grade @ 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503.
9790.13
-
-
... More
Earth work in filling/strengthening bank of canal/Dam/ Budhies/ Guide/ Bandh/ Embankment by hydaulic excavator(poclain/JCB) including proper compaction in layers and dressing with total lead upto 1 km and lift up to 1.5m each in all type of soil by truck or tractor trolley as directed by site in charge.
120270.94
-
-
... More
U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 75 mm dia.
52.5
-
-
... More
Manufacturing, supplying and fixing retro reflective overhead signage boards made up of 2 mm thick aluminium sheet, face to be fully covered with high intensity and encapsulated lens type heat activatedretro reflective sheeting conforming to type - III of ASTM-D-4956-01 as approved by Engineer-in-charge, letters, borders etc. as per IRC : 67-2001 in silver white with blue colour back ground and with highintensity grade, pasted on substrate by pressure sensitive adhesive backing which shall be activated by applying pressure conforming to class II of ASTM-D-4956-01 and fixing the same to the plate of structural frame work by means of suitable sized aluminium alloys, rivets or bolts & nuts @ 300 mm centre to centre all along the periphery as well as in two vertical rows along with theft resistant measures, including the cost of painting with two or more coats of epoxy paint in grey colour on the back side of aluminium sheet including appropriate priming coat. The rate includes the cost of rounding off the corners, lowering down the structural frame work from the gantry, fixing and erecting the same in position all complete as per drawings, specification and direction of the engineer-in charge.(Structural frame work including M.S. plate to be provided separately. Rectangular area of the sheet only shall be measured for payment).16.60.1 Overhead informatory road signage.
5.4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements