Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Irrigation Work
Eprocure
Opening Date23 Nov 2024
Closing Soon29 Nov 2024
Tender Amount₹ 2,52,01,000
Costs
EMD
₹ 5,05,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_976223_5Tender No
02/SE/NAVAM/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Laying Plain cement concrete in 1:2:4 (M15A40)with 20 to 40 mm size crushed kabrai stone ballast & Hamirpur Coarse sand having F.M. not less than 2.0 including all taxes, cost of all material, labour & T&P etc. with Mechanical compaction required for proper completion of work.
86.56
-
-
Laying C.C. 1:2:4(M15A20) using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc. with Mechanical compaction required for proper completion of work.
208.27
-
-
Laying R.C.C. 1:1:2 (M 25A20) in super str. Of bridges using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc. except steel. with Mechanical compaction required for proper completion of work.
533.35
-
-
Laying R.C.C. 1:1:2 (M 30A12) in super str. Of bridges using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc. except steel. with Mechanical compaction required for proper completion of work.
56.17
-
-
Supply and Laying graded filter including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
(a) Coarse sand
54.65
-
-
(b) Pea Gravel
54.65
-
-
(c) 20 to 40 mm naturel shingle
69.84
-
-
Centering & shuttering for C.C Work & enclosed filter including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
1127.51
-
-
Centering & shuttering for R.C.C work including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
996.89
-
-
Centering & shuttering for RCC work T - beam and slab including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
787.78
-
-
Cutting, bending, binding & placing of Steel reinforcement in proper position including cost of all taxes, binding wire, steel labour and T&P. etc. required for proper completion of work.
49.38
-
-
S/F drainage spout pipe 100 mm dia G.I. pipe including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
16
-
-
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
77918.77
-
-
S/F wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
4
-
-
Making subgrade of E/S for Lining with watering , manual comaption and prepration of surface including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
145.5
-
-
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
8.01
-
-
Providing and Fixing steel expansion joint including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
495.04
-
-
Laying Porous concrete in porous window in 1:0:4 with cement and 20 to 40 mm size crushed kabrai stone ballast including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
0.49
-
-
Dry sand filling below foundation including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
20.03
-
-
Supplying and fixing elastomeric bearing including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
104000
-
-
E/W for removing ring bond/coffer dam etc in all type of soil including all lead, lift, royalty with proper dressing & manual compaction for proper completion work.
10515.37
-
-
Providing and Laying Geo textile sheet 200 gsm woven multi filament polypropylene yarn below pitching with pegs including preparetion og surface as a filter material.
580.66
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%