Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date19 Jan 2024
Closing Date27 Jan 2024
Tender Amount₹ 1,67,72,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying R.C.C. 1:2:4 M-15 including all cost of material, labour and T&P etc.

193

-

-

... More
Providing & Laying R.C.C. M-25 Production by batching plant including all cost of material, labour and T&P etc.

283

-

-

... More
Centering & Shuttering for RCC work including all cost of material, labour and T&P etc.

786

-

-

... More
Form work for C.C. Block including all cost of material, labour and T&P etc.

161

-

-

... More
Providing & Laying RBM including all cost of material, labour and T&P etc.

63

-

-

... More
Providing & Filling Ordinary Sand in deep areas & Below the raft foundation including all cost of material, labour and T&P etc.

108

-

-

... More
Dewatering including all cost of material, labour and T&P etc.

8593

-

-

... More
Providing & Fixing Steel Reinforcement for RCC work i/c cost of steel cutting, bending, binding and placing in position including all cost of material, labour and T&P etc.

22

-

-

... More
Supplying & Fixing M.S. Steel Railing (1.10 M height) As per Drawing including all cost of material, labour and T&P etc.

68

-

-

... More
Providing & Fixing 75 mm dia & 6 kg/Cm2 PVC drainage pipe for weep hole including all cost of material, labour and T&P etc.

26

-

-

... More
S/Fixing Extention Joint in slab with tharmacol including all cost of material, labour and T&P etc.

40

-

-

... More
Providing & Laying jhiri width Porous Cement Concrete in 1:0:8 with 10-20mm i/c all cost of material, labour and T&P etc.

9

-

-

... More
Supplying , fabrication and erection of Structural Steel vertical lift crest gates, as per IS:4622 with skin plate stiffeners, ballast weigth, guides, embedded parts, sill beam, fitted with stainless steel flat, track beam and sealing frame fitted with stainless steel flat, roller, rubber seals, rope drum hoist as per IS 6938-2005 Electrically operated hoists (with inbuilt manual operation) including cost of hoisting arangement and decking etc complete as per direction of the Engineer-in-charge Size of gate (2.10x2.0)M

5

-

-

... More
Providing & Fixing M.S. Plate including all cost of material, labour and T&P etc.

82

-

-

... More
Providing & Fixing PVC Rubber Seal 225mm wide including all cost of material, labour and T&P etc.

200

-

-

... More
Providing & Fixing Copper Seal in settlement joint i/c all cost of material, labour and T&P etc.

11

-

-

... More
P/Filling Boulder 20 kg. to 40 kg. in toe wall portion for making base of canal i/c all cost of material, labour and T&P etc. complete.

93

-

-

... More
Providing & Laying Dry Boulder Pitching including all cost of material, labour ant T&P etc. complete

141

-

-

... More
Earth work in for correcting of internal section of FB. by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete. for correcting of internal section of FB.

6740

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.