Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date19 Jan 2024
Closing Date27 Jan 2024
Tender Amount₹ 1,67,72,000
Costs
EMD
₹ 3,36,000Document Cost
₹ 3,979Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_882484_2Bid Award Id
ViewTender No
01/SE/2023-24Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Laying R.C.C. 1:2:4 M-15 including all cost of material, labour and T&P etc.
193
-
-
Providing & Laying R.C.C. M-25 Production by batching plant including all cost of material, labour and T&P etc.
283
-
-
Centering & Shuttering for RCC work including all cost of material, labour and T&P etc.
786
-
-
Form work for C.C. Block including all cost of material, labour and T&P etc.
161
-
-
Providing & Laying RBM including all cost of material, labour and T&P etc.
63
-
-
Providing & Filling Ordinary Sand in deep areas & Below the raft foundation including all cost of material, labour and T&P etc.
108
-
-
Dewatering including all cost of material, labour and T&P etc.
8593
-
-
Providing & Fixing Steel Reinforcement for RCC work i/c cost of steel cutting, bending, binding and placing in position including all cost of material, labour and T&P etc.
22
-
-
Supplying & Fixing M.S. Steel Railing (1.10 M height) As per Drawing including all cost of material, labour and T&P etc.
68
-
-
Providing & Fixing 75 mm dia & 6 kg/Cm2 PVC drainage pipe for weep hole including all cost of material, labour and T&P etc.
26
-
-
S/Fixing Extention Joint in slab with tharmacol including all cost of material, labour and T&P etc.
40
-
-
Providing & Laying jhiri width Porous Cement Concrete in 1:0:8 with 10-20mm i/c all cost of material, labour and T&P etc.
9
-
-
Supplying , fabrication and erection of Structural Steel vertical lift crest gates, as per IS:4622 with skin plate stiffeners, ballast weigth, guides, embedded parts, sill beam, fitted with stainless steel flat, track beam and sealing frame fitted with stainless steel flat, roller, rubber seals, rope drum hoist as per IS 6938-2005 Electrically operated hoists (with inbuilt manual operation) including cost of hoisting arangement and decking etc complete as per direction of the Engineer-in-charge Size of gate (2.10x2.0)M
5
-
-
Providing & Fixing M.S. Plate including all cost of material, labour and T&P etc.
82
-
-
Providing & Fixing PVC Rubber Seal 225mm wide including all cost of material, labour and T&P etc.
200
-
-
Providing & Fixing Copper Seal in settlement joint i/c all cost of material, labour and T&P etc.
11
-
-
P/Filling Boulder 20 kg. to 40 kg. in toe wall portion for making base of canal i/c all cost of material, labour and T&P etc. complete.
93
-
-
Providing & Laying Dry Boulder Pitching including all cost of material, labour ant T&P etc. complete
141
-
-
Earth work in for correcting of internal section of FB. by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete. for correcting of internal section of FB.
6740
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements