Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 40,00,000
Costs
EMD
₹ 80,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_1004681_1Bid Award Id
ViewTender No
15/S.E.-II/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Uprooting Jhunds and Moonj With disposal away from site,but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
7102
-
-
... More
Cutting and uprooting babool trees or jolly flora upto 0.15 m dia, but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
510
-
-
... More
Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm,but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
119497
-
-
... More
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches:(Building)
170
-
-
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work including all Labour, materials, T&P and royalty but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge. In Foundation and floors.
12
-
-
... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work including all Labour, materials, T&P and royalty but Excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge
96
-
-
... More
Dismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60 meters,but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
56
-
-
... More
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even
and smooth including all Labour, materials, T&P and royalty but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
370
-
-
... More
Pointing (Ruled Pointing ) on brick work on eadge floor with cement mortar 1:2 (1cement :2 Fine sand) including all Labour, materials, T&P and royalty but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
76
-
-
... More
Finishing walls with acrylic emulsion paint of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat, but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
382
-
-
... More
Painting of superstructure of gate by applying I coat of red oxide zinc chromate primer and 2 coat of high glass synthetic enamel phiroza blue paint of standard make after proper cleaning, scarping the surface including cost of all material, labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge .
144
-
-
... More
Providing and laying cement concrete in 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work including all Labour, materials, T&P and royalty but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
30
-
-
... More
Greasing oiling of component of lifting mechanism of gates (excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
7
-
-
... More
Providing and fixing PVC pipe ( 75mm Dia ) conforming to IS make working pressure 4 Kg/SqCm incuding testing labour T&P and all complete fittings but excluding cost of GST for proper completion of work as per directed by Engineer-In-Charge.
23
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements