Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date8 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 2,12,00,000
AI Insights
Technical
Technical
Financial
Bid Capacity
... View More
The bid capacity required to bid can be calculated using the formula: Bid Capacity = 2AN - B, where A = Maximum Value of Civil Engineering works executed in any one year during the last Five years, N = Number of years prescribed for completion of the works, and B = Value of existing commitments. Additionally, the bidder should have a minimum average annual financial turnover of at least 30% of the COST OF WORK. The security deposit required is 10% of the Agreement Value for bids up to Rs. 40.00 Lac, and 10% of Rs. 40.00 Lac plus 5% of the rest of the Agreement Value for bids exceeding Rs. 40.00 Lac.
Technical Capacity
... View More
The required prior work experience for the bidder includes having successfully completed similar nature of civil works during the last 7 years. The specific requirements are as follows:
- Three similar completed works costing not less than 40% of the estimated cost.
- Two similar completed works costing not less than 50% of the estimated cost.
- One similar completed work costing not less than 80% of the estimated cost.
The experience will be updated by giving 8% simple weightage per year to bring them to the current financial year price level. Additionally, the bidder's average annual financial turnover during the last 3 years should be at least 30% of the COST OF WORK (without G.S.T). The valuation of work in Experience and in Bid Capacity may be updated to the price level of the last year at the simple rate of 8 per cent a year. Note that the information provided does mention specific values and percentages of similar works completed, which are 40%, 50%, and 80% of the estimated cost for the respective number of similar completed works.
Costs
EMD
₹ 4,24,000Document Cost
₹ 4,474Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_1003701_4Bid Award Id
ViewTender No
13/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and Laying Cement concrete in 1:3:6(1 Cement:3 Coarse sand:6 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
294.5
-
-
... More
Brickwork in 1:4 CM( 1cement:4 Coarse sand) mortar with Common burnt clay(non modular) brick of class designation 150 including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
522.41
-
-
... More
Dry Bricks on edge pitching in sand including preparation of subgrade and filling joints with local sand including cost of sand.
22500
-
-
... More
Providing and fixing of 160 mm dia PVC rigid pressure pipe 6 kg/m2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
115
-
-
... More
Cement pointing on brick work with cement mortar of mix (1cement:2Fine sand) cm including cost of labour materials T&P etc proper completion of work etc. required for proper completion of work as per direction of Engineer-in-Charge.
477.8
-
-
... More
Providing and Laying Cement concrete in 1:2:4(1 Cement:2 Coarse sand:4 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
39.43
-
-
... More
Finishing one coat with waterproof cement paint of approved quality thoroughly brushing the surface to remove all dirt and remains of loose powder and Two coat with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth.
452.68
-
-
... More
Providing and fixing precast reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) kilometre stone as per standard design, including finishing smooth in 1:3 cement mortar (1 cement : 3 fine sand) including the cost of earth work, concrete in foundation, painting and lettering Size(25x111x35)cm & all material labour T&P etc complete for proper completion of work
9
-
-
... More
Earth work in Cutting embankment in ordinary soil , earth work in embankments to be in 20 cm layers, including ramming and dressing the surface to the requires levels, slopes and also including 1.50 metre lift and the earth from cutting to be used in making embankment or to be deposited on banks as directed by Engineer- in- Charge.
13250.3
-
-
... More
Earth work in Dowla making and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and upto 1Km lead incluiding borrowed earth from private land as directed by Engineer In Chrage.
19123.55
-
-
... More
Centering and Shuttering of RCC Precast boundry piller size 300X300X1650 (mm) including cost of material, labour, T&P etc. proper completion of work as per direction of Enginner-in-charge
147.4
-
-
... More
Supplying and placing of steel reinforcement including cost of materials,labour,T&P etc. proper completion of work as per direction Engineer-in-charge
675.84
-
-
... More
Providing and laying of LDPE film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. length=(1200+800)1/2=900
208.78
-
-
... More
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge
88
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements