If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date8 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 63,00,000
Costs
EMD
₹ 1,26,000Document Cost
₹ 2,984Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_1003701_2Bid Award Id
ViewTender No
13/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement pointing on brick work with cement mortar of mix (1cement:2Fine sand) cm including cost of labour materials T&P etc proper completion of work etc. required for proper completion of work as per direction of Engineer-in-Charge.
296.74
-
-
... More
Finishing walls (Two coat ) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undecorated wall surface to give even shade@ 1.25 litre/10sqm including one coat of primer applied @ 0.75 litre/sqm, including cost of all materials, labour T&P etc. complete required foe proper completion of work.
87.78
-
-
... More
Providing and fixing of 75mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
4
-
-
... More
Earth work in Dowla making and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and up to 1Km lead including borrowed earth from private land as directed by Engineer In Chrage.
9248.9
-
-
... More
S/F tar felt on bed block as per direction of engineer in charge .
3.76
-
-
... More
Providing and fixing of 110mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
42
-
-
... More
Dry straight overburnt Bricks on edge pitching in sand including preparation of subgrade and filling joints with local sand including cost of sand.
3000
-
-
... More
Providing and fixing of 125 mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
6
-
-
... More
Providing and fixing of 160 mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
36
-
-
... More
Centring and shuttering for CC work including rent of shuttering material, labour and T&P required for proper completion of work etc.
25.49
-
-
... More
Centring and shuttering for RCC work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintels, sunshade,columns, & wall.
108.87
-
-
... More
Providing and fixing precast reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) kilometre stone as per standard design, including finishing smooth in 1:3 cement mortar (1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately.
5
-
-
... More
S/Laying boulder in random rubble (1:4) Cement Mortar in Slope and bed including cost of all labour and T&P etc. Complete as per instruction of Engineer-in-charge.
108
-
-
... More
Brickwork in 1:4 CM( 1cement:4 Coarse sand) mortar with Common burnt clay(non modular) brick of class designation 150 including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
267.4
-
-
... More
Providing and Laying Cement concrete in 1:3:6(1 Cement:3 Coarse sand:6 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
86.73
-
-
... More
Providing and Laying Cement concrete in 1:2:4(1 Cement:2 Coarse sand:4 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
16.64
-
-
... More
Providing and Laying Cement concrete in 1:1.5:3(1 Cement:1.5 Coarse sand:3 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
6.85
-
-
... More
Providing and Laying reinforced Cement concrete in 1:1.5:3(1 Cement:1.5 Coarse sand:3 graded stone Aggregate 20 mm nominal size) including Supply of all material, labour , and T&P etc required for Proper completion of work .
4.95
-
-
... More
Providing and laying (M 25)R.C.C 1:1:2 with coarse sand and aggregate of size 10 to 20 mm including mechanical mixing and all cost of material, labour and T&P etc. but excluding cost of steel reinforcement.
14.14
-
-
... More
Steel reinforcement with bending, binding, cutting and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P etc. for completion of work.
1.51
-
-
... More
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge
48
-
-