Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Nov 2024
Closing Date19 Nov 2024
Tender Amount₹ 5,63,02,000
Costs
EMD
₹ 11,26,040Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_963983_2Bid Award Id
ViewTender No
04/SE-6/2024-25 LOT3Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/Package Tenders
04/SE-6/2024-25 LOT704/SE-6/2024-25 LOT1104/SE-6/2024-25 LOT10...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P.C.C. 1:3:6 with cement, coarse sand and stone ballast 22.4 to 53mm size- For Gauge Site, Outlets, Kilometer Stone, Tail Fall, Boundary Piller,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
359.69
-
-
... More
1st class Brick work in 1:4 in cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of work - For Outlets, Tail Fall, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075, Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
1018.31
-
-
... More
1st class Brick work in 1:3 in cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of work - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329, Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 9.100.
122.35
-
-
... More
Centering & shuttering for C.C. Block including cost of shuttering material, labour and T&P etc. - For Gauge Site, Outlets, Kilometer Stone, C.C. Lining, Tail Fall & Boundary Piller.
3227.77
-
-
... More
Centering & shuttering for R.C.C. work for bridge upto 3 m span including rent of shuttering material, labour and T&P etc - For Gauge Site,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
150.8
-
-
... More
Centering & shuttering for R.C.C. work for bridge above 3 m span including rent of shuttering material, labour and T&P etc - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 13.043 & 14.110.
441.59
-
-
... More
Centering & shuttering for R.C.C. work for T-beam bridges, syphon and aqueduct including rent of shuttering material, labour and T&P etc - For Reconstuction of Syphon at Km. 20.984.
283.05
-
-
... More
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 8 MM DIA TMT- For Gauge Site, Kilometer Stone,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329, Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 9.100.
0.84
-
-
... More
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 10 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
8.66
-
-
... More
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 12 MM DIA TMT- For Gauge Site, Kilometer Stone & Reconstuction of Syphon at Km. 20.984.
3.17
-
-
... More
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 16 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
5.26
-
-
... More
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 20 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 13.043 & 14.110.
6.28
-
-
... More
4MM DIA G.I. Wire Reinforcement including cost binding wire and bending, cutting, binding and placing in position including T&P.- For Boundry Piller.
1.83
-
-
... More
R.C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1.5:3 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work. - For Gauge Site, Kilometer Stone, Boundry Piller, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
197.94
-
-
... More
C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1.5:3 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work.- For Outlets & Tail Fall.
54.36
-
-
... More
C.C.1:1:2 with cement, coarse snad and stone grit 6.7 to 11.20 mm size - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
26.43
-
-
... More
R.C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1:2 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work.- For Reconstuction of Syphon at Km. 20.984.
83.28
-
-
... More
C.C.1:2:4 with cement, coarse sand and stone grit 6.7 to 11.20 mm size - For C.C. Lining & Reconstuction of Syphon at Km. 20.984.
224.51
-
-
... More
Providing 100 mm thick M-15 (1:2:4) Cement concrete in lining with 4.75 to 20 mm size graded hard stone grit and coarse sand by paver machine and chemical curing on side slope with cost of all material labour centering and shuttering T&P required for proper completion of work. - For C.C. Lining.
7277.33
-
-
... More
Flush cement pointing with 1:2 cement and coarse sand on brick work - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075, Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
1040.28
-
-
... More
10 to 15 mm thick cement plaster in 1:4 cement mortor single coat on rough side of single or half brick wall for interior plastering in single storey building finish even & smooth including all cost of material labour T&P etc for complete work- For Gauge Site, Outlets & Tail Fall.
1700.61
-
-
... More
Laying brick soling layer on prepared subgrade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth spreading 25 mm thick layer of earth over brick soling watering and rolling the same with three wheel road roller 80-100 KN as per MORTH. - For Brick Soling, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
22138
-
-
... More
Edging with straight over burnt laid by lengthwise including excavation, refilling consolidation with a hand packing and spreading nearly surplus earth with in a lead of 50 mtr.- For Brick Soling.
14.26
-
-
... More
Levelling & dressing for preparing of subgrade for laying of brick soling - For Brick Soling.
21.39
-
-
... More
Making sub grade in lining work including watering compaction and preparation of surface.- For C.C. Lining.
7277.73
-
-
... More
Providing and laying in local sand in filter including cost of material labour T&P etc. - For C.C. Lining.
545.8
-
-
... More
Providing & Fixing of Wheel guard ( 0.20x0.15x0.75 M) - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
44
-
-
... More
Providing & Fixing of PVC Pipe for Drainage pipe/Weep holes - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
20
-
-
... More
Providing and fixing 110mm PVC pipe Required for proper completion of work as per direction of Engineer-in-charge. - For Outlets & Tail Fall.
639.9
-
-
... More
Supplying and laying L.D.P. film including cost of all material labour, T&P required for proper completion of work. - For C.C. Lining.
7882.61
-
-
... More
Painting on top of sleeper with sealing compound including cost of all material fuel for heating labour T&P required for proper completion of work.- For C.C. Lining.
1044.59
-
-
... More
Finishing walls with premium Acrylic smooth exterior paint with silicon additives of required shade: 13.47.1 new work (Two or more coats applied @ 1.43 ltr 10 sqm over and including priming coat of exterior primer applied @ 2.20kg./10 sqm) - For Gauge Site, Outlets, Kilometer Stone, Tail Fall, Boundary Piller,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
3536.04
-
-
... More
Painting on Iron works in small areas with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work - For Repairing & Painting work of Pakka Structure
15.81
-
-
... More
Painting Letters above 8 cm size complete including supply of all material labour & T&P etc. - For Kilometer Stone.
884
-
-
... More
Writing Letter on Sign Board above 50 mm size but below 80 mm size complete including supply of all material labour & T&P etc. - For Boundry Piller.
2952
-
-
... More
Dewatering by 7.5 H.P Deisel pump in per hour.- For Reconstuction of Syphon at Km. 20.984.
41
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements