Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date28 Oct 2023
Closing Date2 Nov 2023
Tender Amount₹ 9,31,333 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
S/F Drainage spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc

8

-

-

... More
E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc.

210

-

-

... More
Laying C.C for wearing coat A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 10mm including lead up to 60m lift up to 3m mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.

2.2

-

-

... More
E/W in making approach with local earth required for proper completion of work including cost labour T&P etc.

40

-

-

... More
E/W in making canal section U/S and D/S of VRB/DRB i/c cost of all lead lift , dressing and manual compaction etc.

220

-

-

... More
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper completion of work including cost of all material, labour, T&P etc

4

-

-

... More
Laying C.C, A-40, M-15 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.

23.5

-

-

... More
Laying R.C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.

37

-

-

... More
E/W in Removing diversion in all type of soil including lead up to 30m and lift up to 1.5 m with cost of all T&P,Labour etc.

297

-

-

... More
Dismantling of 1st class brick on edge soling on diversion including cost of all T&P,Labour etc.

108

-

-

... More
E/W in making Diversion in all type of soil including lead up to 30.00 lift up to 1.50m with manual compaction and dressing required for proper completion of work

297

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.