Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Nov 2024
Closing Date12 Nov 2024
Tender Amount₹ 3,70,94,000
Costs
EMD
₹ 7,42,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Summary
Renovation Of Earthen Section, Pucca Works
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_964703_3Bid Award Id
ViewTender No
04/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
P/L C.C. 1:3:6 in foundation with one part of cement , three part of coarse sand and six part of stone ballast 20 to 40 mm size including cost of all materials labour, T&P etc required for proper completion of work.
1128.3
-
-
First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.
2288.5
-
-
Centering and shuttering for R.C.C. and C.C. work including cost of all materials labour, T&P etc required for proper completion of work .
735.4
-
-
Bending, Binding, Cutting and placing in position steel reinforecement including cost of all materials labour, T&P etc required for proper completion of work.
15.3
-
-
P/L R.C.C. 1:1.5:3 with one part of cement , one& half part of coarse sand and three part of hard stone grit 4.75 to 20 mm size including cost of all materials labour, T&P etc required for proper completion of work.
171.3
-
-
P/L C.C. 1:1.5:3 with one part of cement , one & half part of coarse sand and three part of hard stone grit 4.75 to 20 mm size including cost of all materials labour, T&P etc required for proper completion of work.
50.6
-
-
Struck Deep pointing in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.
2821.2
-
-
P/F wheel gaurd stone as per direction of engineer in-charge including cost of all materials labour, T&P etc required for proper completion of work.
40
-
-
Finishing walls with water proofing cement paints of approved make such as super snoweem. Durrocem robiceem, guttueem supreme, quality and of required shed on new wall surface two coat over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered material including curing and cost of all material.
1790.9
-
-
Fabrication and supply sign board on angle iron framd 40 x 40 x 6 mm. 25 x 5 mm. flat iron board sand 16 SWG M.S. Sheet of board size 1200x900 mm including two coat of iron work approved synthetic enamel paint and lettering,fixing of sign board at canal head by c.c. 1:4:8 including cost of all material, labour, T&P etc. required as per directed by Engineer in charge as per approved drawing inclosed.
11
-
-
Renovation of steel gate by taking out rusted &damaged leaf with channel and providing outer channel,spendle rod,inner channel check nut and mild steel leaf with other accesseries as per requered including cost of all material, labour, T & P etc. required for proper completion of work .
9
-
-
P/L LDPE film on footing box including cost of all materials labour, T&P etc required for proper completion of work.
407.6
-
-
P/Fixing Precast RCC Boundary Pillar(250 x250 x900 mm) including cost of all materials labour, T&P etc required for proper completion of work.
172
-
-
Providing & Fixing 150 mm outlets including earth work and labour charges for fixing collars and making joints water tight.
331.2
-
-
First class brick pitching on edge over road ramp, filling joint with local sand including all cost of materials, labour, T&P etc complete required for proper completion of work.
65.1
-
-
Earth Work in filling in canal by manual labour with all lead and lift in all type of soil with disposal as directed by site in charge.
12139.2
-
-
Earth Work in filling in canal by manual labour with all lead and lift in all type of soil with disposal as directed by site in charge.
59971.5
-
-
Earth work in strengthening of bank & correcting section of canal , road diversion and ramp etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .
5193.7
-
-
Earth work in strengthening of internal section by manual labour with filling E.C. bag with earth sewing with sutli and placing in proper position including cost of all material, labourT & P etc. for proper completion of work .
87536
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements