Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 3,94,13,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. lift. in Mar, Kabar and Rankar soil.

600.36

-

-

... More
Earth work in Excavation including all cost of labour material T&P etc.

4850.02

-

-

... More
Earth Work in filling in Mar, Kabar, Ranker & Kanker Mixed Soil with all lead and lift including all cost of material labour T&P etc.

59795.8

-

-

... More
Coarse Sand including all cost of labour material T&P etc.

1957.96

-

-

... More
P.C.C. 1:3:6 nominal mix including all cost of labour material T&P etc.

258.57

-

-

... More
Centering and shuttering for P.C.C. work including of cost of shuttering. material and T & P etc. required. for proper completion of work.

5408.14

-

-

... More
Centering and shuttering for R.C.C. work including of cost of shuttering. material and T & P etc. required. for proper completion of work.

150.57

-

-

... More
Steel reinforcement including cutting, beding, binding and placing for proper completion of work.

1.73

-

-

... More
Laying R.C.C. 1:1.5:3 nominal mix by mechanical mixing. including cost of all material, labour and T&P etc. all leads and lifts for proper completion of job as per direction of Engineer-in-charge.

43.92

-

-

... More
C.C. 1:1.5:3 (200x150)mm Nominal Mix including all cost of labour material T&P etc.

453.37

-

-

... More
C.C. 1:2:4 Nominal Mix including all cost of labour material T&P etc.

31.9

-

-

... More
Providing and fixing P.V.C. pipe 75 MM dia including all cost of material, labour and T&P etc. complete of work.

720

-

-

... More
Providing and Laying with stone boulders pitching of minimum size and weight less than 25 Kg. laid dry complete as per drawing and technical specifications.

307.05

-

-

... More
Supplying and laying of 900mm dia. R.C.C. hume pipe including all Carriage, loading, unloading, material, labour, T&P etc. complete of work.

12

-

-

... More
Prepration of subgrade excluding cost of earth work.

20075

-

-

... More
C.C. Lining 1:1.5:3 Nominal Mix including all cost of labour material T&P etc.

1505.63

-

-

... More
Laying 125 micron polythene sheet including all cost of labour material T&P etc.

20476.5

-

-

... More
Construction Joint of C.C. Lining with bitumen sealing compound including all cost of labour Material T&P etc.

6698.9

-

-

... More
Laying Two Coat of Bitumen sealing compond on top of sleepers of C.C. Lining works including all cost of labour material T&P etc.

1005.2

-

-

... More
R.C.R. Masonary including all cost of labour material T&P etc.(Reusable dismantled material cut stone boulder from iteam No. 2 shall be used up to 20 % from dismantaled quantity. If dismantaled material found more than 20% usable be taken on stock as par direcetion of Engineer-in-Charge.)

394.71

-

-

... More
Struck Pointing (Raised or Struck Deep on Stone masonry in Cement or lime) including all cost of labour material T&P etc.

946.77

-

-

... More
Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) 6mm thick including all cost of material, labour, T&P etc. complete.

23.43

-

-

... More
Painting Two coat on wall including scraping old paint & cost of all material, labour and T&P required for proper finish of work.

318.77

-

-

... More
Removal of Saturated (excluding cost of dewatering) in Mar, Kabar and ranker soil with all lead and lift including all cost of material, labour, T&P etc. complete.

2452.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.