Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Eprocure
Opening Date16 Jan 2025
Closing DateCancelled
Tender Amount₹ 58,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work.

73.22

-

-

... More
Providing and fixing Centering & shuttering in Straight Portion of C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge .

186.46

-

-

... More
Providing and fixing Centering & shuttering in Straight Portion of R.C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge .

201.61

-

-

... More
Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. complete for proper completion of work as per directed by engineer in charge.

250.46

-

-

... More
Brick work in 1:4 cement mortar including cost of all mterials, labour and T&P for proper complition of work in super structure up to1.50 mtr height.

15.75

-

-

... More
Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work.

26.7

-

-

... More
Providing & Fixing steel Angle 65 x 65 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.

6

-

-

... More
Providing & Fixing of 100 mm dia PVC Pipe for cables etc. in crash barrier and parapets in position including cost of all mterial, labour and T&P for proper complition of work.

19.04

-

-

... More
Cutting, Bending, Binding & Placing in position of steel reinforcement (above10mm Dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work for proper completion of work as per directed by engineer in charge.

13.2

-

-

... More
Cutting, Bending, Binding & Placing in position of steel reinforcement (up to10mm Dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work for proper completion of work as per directed by engineer in charge.

2.52

-

-

... More
Provide & Laying Boulder 20.00 to 40.00 kg.wt in bed & sides with all lead and lift including cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge.

1.74

-

-

... More
Provide & Fixing PVC water stop seal for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.

1.2

-

-

... More
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 600m distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.

1800

-

-

... More
Supplying & laying of RBM on approaches and diverson including all lead lift, compaction, dressing as required for proper completion of work including all cost labour, material and T&P etc. completeor as Directed By Engineer in Charge.

135

-

-

... More
Supply and Fixing 75mm Dia PVC Pipe for drainage sqouts. Including cost of all material T&P, labours etc for proper completion of work as per directed by engineer in charge.

2.8

-

-

... More
Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work as per directed by engineer in charge.

4

-

-

... More
Providing and Fixing of year Plate for proper completion of work as per directed by engineer in charge.

1

-

-

... More
Providing and fixing of B.M Plate for proper completion of work as per directed by engineer in charge.

1

-

-

... More
Providing & Fixing sign caution board in position including cost of all mterial, labour and T&P for proper complition of work.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.