Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Dec 2023
Closing DateCancelled
Tender Amount₹ 27,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper compeltion of work as per direction of Engineer-in-Charge.

404.95

-

-

... More
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-charge.

117.94

-

-

... More
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M.2.00) including cost of labour, materials, T&P etc. for proper completion of work as per direction of Engineer-in-charge.

263.49

-

-

... More
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

76.82

-

-

... More
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

12.06

-

-

... More
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

14.34

-

-

... More
Reinforcement of R.C.C. work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

2.48

-

-

... More
Laying R.C.C. M-20 (1:1.5:3) A-20, M-20 with cement, crushed grit size 10mm to 20mm well graded including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

24.16

-

-

... More
Laying C.C. M-20 (1:1.5:3) A-20, M-20 with cement, crushed grit size 10mm to 20mm well graded including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

5.03

-

-

... More
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

777.38

-

-

... More
E/w in filling for making approach path & diversion including all lead & lift etc. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. f Engineer-in-Charge.

202.13

-

-

... More
E/w Dismentaling of diversion including all lead & lift, cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. f Engineer-in-Charge.

156

-

-

... More
Dry stone boulder Pitching 200mm thick, filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.

7.5

-

-

... More
Colour washing of two coat of parapet including cost of all materials, labour and T&P etc.

67.6

-

-

... More
Fixing wheel guard stone including cost of all materials, labour and T&P etc.

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.