If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date9 Oct 2023
Closing Date16 Oct 2023
Tender Amount₹ 3,61,16,481.01 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Nit06/se/2023-24 Lot-06(re-tender)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.R.stone masonary lining in 1:4 cement coarse sand mortar including cost of all material labour and T&P etc. and curing but Excluding cost of cut stone etc. Required for proper completion of work as per direction of E-in -Charge.(Departmental)

273.68

-

-

... More
Laying wearing coat in bed of canal and top of masonary wall in C.C. 1:1.5:3 (m 20) with 6.75 -20 mm size stone grit including cost of all material labour and T&P etc. and curing Required for proper completion of work as per direction of E-in -Charge.

306.9

-

-

... More
Struck deep pointing on stone masonary in cement sand mortar 1:2 including cost of all material ,labour ,T&P and curing etc .for proper completion of work.

9912.44

-

-

... More
Preparation of sub grade for lining including cost of all material ,labour, T&P,etc.complete in all respect.

4640.16

-

-

... More
Providing and laying graded hard stone ballast 25 mm to 50 mm size in filter bellow lining including cost of all materials, labour ,T&P etc. required for proper completion of work.

654.05

-

-

... More
Providing and laying 50 mm thick local sand below C.R. Stone masonary lining including cost of all material labour, T&P etc. complete in all respect.

257.21

-

-

... More
Supplying and fixing 150 mm HDPE Kulaba pipe pressure 6kg /sqm. Including cost of all material, labour T&P etc as per direction of E-In-C

471

-

-

... More
Laying C.C. 1:2:4(M15) in coping with coarse sand and 6.75-20 mm size stone grit including cost of all material, labour, T&P and curing as per direction E-IN-C etc.

48.85

-

-

... More
Supplying and fixing of I- shaped Precasted R.C.C. Piller (0.15x0.15m) including cost of material, labour, T&P, etc as per direction of E-in -Charge.

218

-

-

... More
Providing and laying M-20 (1:1.5:3)C.C. with 4.75 to 20 mm size stonegrit and coarse sand in Piller cap including cost of material,labour, T&P, etc as per direction of E-in -Charge. But excluding cost of reinforcement.

85.32

-

-

... More
Distempering with dry distemper of approved brand (two coat) over one coat priming coat of whiting on new surface after throroughly brushing the surface free from dropping and other foreign matter including preparing the surface even and sand paper smooth including cost of all labour, T&P, etc. Required for proper completion of work.

292.12

-

-

... More
Writing letter above 80 mm size on boundry wall Piller including cost of all Labour, T&P etc. Required for proper completion of work.

3706

-

-

... More
Dismantling stone work in lime or cement mortar including stacking of material as directed by E-in -C within a distance of 60 mtr

23.04

-

-

... More
Providing shuttering and centering work for different part of structure including all cost of material, labour, T&P, Taxes etc Required for proper completion of work.

150.36

-

-

... More
Providing bending and binding Tor steel Fe 415 conforming to is:1786-1985 complete in all respect

4.22

-

-

... More
Providing and laying 18 mm thick bituminous Premoulded Pads complete in all respect including Resilient joint Filler at top.

13.08

-

-

... More
4 inch dia G.I. Dranaige pipe

9

-

-

... More
Providing and laying 3mm thick polyplus tor paper complete in all respect including Resilient joint Filler at top.

14.73

-

-

... More
Supply of steel item for fabrication of gate including cost of all labour,material, T&P. etc.for proper completion of work.

707.73

-

-

... More
Cutting and Denting of different part in Fabrication of gate including cost of all labour,material, T&P. etc.for proper completion of work.

30.15

-

-

... More
Welding of different part in Fabrication of gate including cost of all labour,material, T&P. etc.for proper completion of work.

44.58

-

-

... More
Turning of steel rod & coller of gate including cost of all labour,material, T&P. etc.for proper completion of work.

45

-

-

... More
Making 40 mm hole in bush & 50 mm hole in top plate of gate including cost of all labour,material, T&P. etc.for proper completion of work.

3

-

-

... More
Threading of 50 mm dia M.S. rod &Bush of gate including cost of all labour,material, T&P. etc.for proper completion of work.

322.86

-

-

... More
Hiring of Tractor trolly with driver for carriage of fabricated gate.

6

-

-

... More
Erection of gate in proper alignment including cost of all labour,material, T&P. etc.for proper completion of work.

707.73

-

-

... More
Painting of gate with one coat of red oxide and two coat of synthetic enamal paint on new steel surface including cost of all labour,material, T&P. etc.for proper completion of work.

29.37

-

-

... More
Greasing on new gate including cost of all labour, material, T&P. etc.for proper completion of work.

3

-

-

... More
oiling on new gate including cost of all labour, material, T&P. etc.for proper completion of work.

3

-

-

... More
E/W in filling for restoration /strengthening internal section including making doula and bank of canal by all type of good earth transported by truck or tractor trolly with all lead and lift manual compaction and dressing ,labour and required all T&P etc . for proper completion of work.

22978.88

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.