Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Bridge Construction
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Sep 2024
Closing Date30 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of V.r.b. On Kurebhar Drain

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying C.C. 1:3:6 in foundation with coarse sand & stone ballast 20 to 40 mm. size including cost of all material abour T&P etc.

125.3

-

-

... More
1st class brick work in 1:4 CM making abutment, toe wall & wing wall including cost of all material, labour and T&P etc.

278.27

-

-

... More
1st class brick work in 1:3 cm making Piers including cost of all material, labour and T&P etc.

69.57

-

-

... More
Steel work in RCC Structure including cutting,bending & placing in position, binding wire and cost of all material, labour and T&P etc.

2.56

-

-

... More
PCC with 1:1.5:3 in RCC Structures coarse sand and stone grit 12-20 mm. Gauge. Mixing and laying including cost of all material, labour and T&P etc.

68.19

-

-

... More
P.Cement concrete 1:1.5:3 in cement coarse Sand and Stone grit 4.75mm to 10mm mixing and including cost of all material, labour and T&P etc.

5.16

-

-

... More
Providing and laying centering & shuttering for foudation concrete works including cost of all labour T&P etc.

98.42

-

-

... More
Providing and laying centering & shuttering for Super structure concrete works including cost of all labour T&P etc

89.62

-

-

... More
Stuck deep cement pointing in 1:2 Cm with coarse sand including cost of all material, labour and T&P etc.

205.75

-

-

... More
Filling expansion Joint with joint filler board 25mm thick as per directon of engineer in charge.

0.63

-

-

... More
S/F of P.V.C.pipe 75mm dia including cost of all material, labour and T&P etc.

44.2

-

-

... More
E/W in making road diversion and road ramps including all lead and lifts, labour and T&P etc.

1499.03

-

-

... More
Painting two coat of synthetic enamel paint on new surface with superior quality approved make including cost of all material labour T&P etc. required for proper completion of work

205.75

-

-

... More
Letter writing with synthetic enamel paint on new surface with superior quality approved make including cost of all material, labour, T&P etc. required for proper completion of work.

60

-

-

... More
Dewatering by 5.0 H.P. diesel pump , including hiring incharge of pump with operator & P.O.L. for running hours etc. all required for completion of works.

900

-

-

... More
Boring with of 15 cm casing pipe including lowering of assembly and extracting casing pipe with contractor T&P equipment upto 30m. including all cost of material labour T&P of boring carriage charge lowering etc

80

-

-

... More
Brick on edge soling including cost of all material, labour and T&P etc.

110

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.