If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Bridge Construction
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Sep 2024
Closing Date30 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,05,000Document Cost
₹ 1,600Tender Fee
Refer Documents
Summary
Construction Of V.r.b. On Kurebhar Drain
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_957651_2Bid Award Id
ViewTender No
02/SE/2024-25/C-44Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying C.C. 1:3:6 in foundation with coarse sand & stone ballast 20 to 40 mm. size including cost of all material abour T&P etc.
125.3
-
-
1st class brick work in 1:4 CM making abutment, toe wall & wing wall including cost of all material, labour and T&P etc.
278.27
-
-
1st class brick work in 1:3 cm making Piers including cost of all material, labour and T&P etc.
69.57
-
-
Steel work in RCC Structure including cutting,bending & placing in position, binding wire and cost of all material, labour and T&P etc.
2.56
-
-
PCC with 1:1.5:3 in RCC Structures coarse sand and stone grit 12-20 mm. Gauge. Mixing and laying including cost of all material, labour and T&P etc.
68.19
-
-
P.Cement concrete 1:1.5:3 in cement coarse Sand and Stone grit 4.75mm to 10mm mixing and including cost of all material, labour and T&P etc.
5.16
-
-
Providing and laying centering & shuttering for foudation concrete works including cost of all labour T&P etc.
98.42
-
-
Providing and laying centering & shuttering for Super structure concrete works including cost of all labour T&P etc
89.62
-
-
Stuck deep cement pointing in 1:2 Cm with coarse sand including cost of all material, labour and T&P etc.
205.75
-
-
Filling expansion Joint with joint filler board 25mm thick as per directon of engineer in charge.
0.63
-
-
S/F of P.V.C.pipe 75mm dia including cost of all material, labour and T&P etc.
44.2
-
-
E/W in making road diversion and road ramps including all lead and lifts, labour and T&P etc.
1499.03
-
-
Painting two coat of synthetic enamel paint on new surface with superior quality approved make including cost of all material labour T&P etc. required for proper completion of work
205.75
-
-
Letter writing with synthetic enamel paint on new surface with superior quality approved make including cost of all material, labour, T&P etc. required for proper completion of work.
60
-
-
Dewatering by 5.0 H.P. diesel pump , including hiring incharge of pump with operator & P.O.L. for running hours etc. all required for completion of works.
900
-
-
Boring with of 15 cm casing pipe including lowering of assembly and extracting casing pipe with contractor T&P equipment upto 30m. including all cost of material labour T&P of boring carriage charge lowering etc
80
-
-
Brick on edge soling including cost of all material, labour and T&P etc.
110
-
-