Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Aug 2024
Closing DateCancelled
Tender Amount₹ 10,92,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ist class brick work in 1:4 C.M. With coarse sand of F.M. not less than 2.0 including all taxes cost of all material, labour and T&P. required for proper completion of work but excluding GST

70.2

-

-

... More
Centering & shuttering for R.C.C work (span 3 to 10 m) including all taxes, cost of all material, labour and T&P etc. required for proper completion of work but excluding GST.

33.5

-

-

... More
Cutting, bending, binding & placing of Steel reinforcement in proper position including all taxes, cost of binding wire, steel all labour and T&P. etc. required for proper completion of work but excluding GST.

1.14

-

-

... More
Supplying and Laying tarfelt in two layers including all taxes, cost of all material, labour and T&P etc. required for proper completion of work but excluding GST.

3.84

-

-

... More
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P. etc. required for proper completion of work but excluding GST.

4.67

-

-

... More
Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes cost of all material, labour and T&P except steel. required for proper completion of work but excluding GST.

16.08

-

-

... More
E/W in embankment in making ramp in all type of soil including all taxes all leads, lifts with proper dressing & manual compaction required for proper completion of work but excluding G.S.T.

111.53

-

-

... More
S.O.B. brick on edge soling including all taxes, preperation of subgrade and filling joints with local sand/earth with cost of all material, labour and T&P etc. required for proper completion of work but excluding G.S.T.

192.25

-

-

... More
Deep struck Cement Pointing in 1:2 CM with fine coarse sand including all taxes, cost of all material, labour & T&P. required for proper completion of work but excluding G.S.T.

85.1

-

-

... More
S/F Wheel guard stone including all taxes, cost of all material, labour & T&P. by manufacturing at site, all material, labour and T&P etc.required for proper completion of work but excluding GST.

4

-

-

... More
E/W removal of road diversion in all type of soil including all taxes all leads, lifts with proper dressing & manual compaction required for proper completion of work but excluding GST.

145.6

-

-

... More
E/w correcting canal section including all taxes all lead and lift with manual compaction required for proper completion of work but excluding G.S.T.

251.3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.