Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date19 Sep 2024
Closing Date25 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering & shuttering for C.C. work up to 10m span including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.

22.97

-

-

... More
Centering & shuttering for R.C.C. work up to 10m span including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.

42.18

-

-

... More
Laying 80/100 grade bitumen paint with two coat including all taxes, cost of material, labour and T&P, required for proper completion of work.

8.1

-

-

... More
Steel reinforcement with its Cutting, bending, binding and placing in position with all cost of labour, material and T&P.

1.08

-

-

... More
S/f 20 mm. thick joint filler board in construction joint including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.

8.53

-

-

... More
Laying R.C.C. 1:1.5:3 using 4.75 mm. to 20 mm. size (M20 A20) crushed kabrai stone grite with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc.

17.97

-

-

... More
Cement pointing (Struck deep) in 1:2 cm with hamirpur fine coarse sand including all taxes, cost of all material, labour & T & P etc. required for proper compaction of work.

91.83

-

-

... More
E/W in embankment in making ramp in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work.

630

-

-

... More
E/W in embankment in making road diversion in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.

3379.6

-

-

... More
SOB Brick on edge soling on diversion/ramp including prepration of surface and filling joints with local sand including all taxes, cost of all material, labour & T & P etc. required for proper compaction of work.

545

-

-

... More
Dismentling of SOB Brick on edge soling from diversion including stacking with all material labour and t&p etc. required for proper completion of work.

288.85

-

-

... More
Relaying dismentling SOB brick on edge soling from diversion on canal service road including prepration of service & filling joints with local sand including all taxes, cost of all material ,labour and t&p etc. reqired for proper completion of work.

288.85

-

-

... More
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.

1739.91

-

-

... More
Supply and fixing of wheel guard including all taxes, cost of material, labour and T&P, required for proper completion of work.

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.