Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Nov 2024
Closing Date19 Nov 2024
Tender Amount₹ 2,94,63,000
Costs
EMD
₹ 5,89,260Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_958266_3Bid Award Id
ViewTender No
03/SE-6/2024-25 LOT5Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/Package Tenders
03/SE-6/2024-25 LOT303/SE-6/2024-25 LOT203/SE-6/2024-25 LOT5...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Demolishing brick work in Lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge For vrb at km 3.467
234.28
-
-
Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. For vrb at km 8.225 and inlet no,1 and inlet no 2
192.29
-
-
Earth work in strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no 1
30363.83
-
-
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
900
-
-
E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
1152.75
-
-
Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
441.6
-
-
Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. (Cement- Ultratech/ A.C.C / J.k super /Birla ) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225,
143.13
-
-
Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grie including cost of material, labour, T&p etc, complete.(Cement-Ultratech/ A.C.C / J.k super /Birla )All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
46.69
-
-
Laying Reinforced Cement Concrete ( M25 ) in Raft , Abetment , Piers, slab etc. in with Superplasticizer (Admixture) using Cement (Ultratech/ A.C.C / J.k super /Birla (43 grade)) with Coarse Sand & 10 mm - 20mm Kabrai stone Aggregate by using batching plant transit mixer & Concrete pump including cost of all material, labour, T&p etc, complete. All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
491.92
-
-
Bending,Binding,Cutting and Placing in position reinforcement ( TATA / SAIL / JSW ) including all cost of labour and material T&P etc. required for porper completion of the work/MT. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, Km stone, cb stone
37.45
-
-
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
1106.44
-
-
Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
13.2
-
-
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. (Ultratech/ A.C.C / J.k super /Birla) All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2
445.87
-
-
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
43.2
-
-
Providing & Fixing Bitumen Joint filer Board For Expansion Joints. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
60.87
-
-
12 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
402.6
-
-
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2
230.5
-
-
Dry brick on end pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
327.97
-
-
Dry brick on Edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
600
-
-
Supplying & Laying 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender. The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally ocurring acids and alkalies. including contractor's profit. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
575
-
-
Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing .All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and boulder pitching
1786.6
-
-
Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
33
-
-
Painting Chainage & Name of Canal on Km Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For Km stone
9
-
-
Painting Chainage / No. on Canal Boundary Stone / 200M Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For cb Stone
83
-
-
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For inlet no 1 and inlet no 2
48
-
-
Earth work in Remodelin of escape section for boulder pitching with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. All Work done as per direction of Engineer-in-charge. For boulder pitching
2125.03
-
-
Making sub grade in linning work including watering, compaction and preparation of surface. All Work done as per direction of Engineer-in-charge. For boulder pitching
6500
-
-
Supplying & Layin 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender. The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally ocurring acids and alkalies. including contractor's profit. All Work done as per direction of Engineer-in-charge. For boulder pitching
6500
-
-
Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing in 8mm SWG GI Wire Crate Size 1.50x1.50x0.50M mesh Size 0.15x0.15 M including All Cost of Labour material T&P etc. All Work done as per direction of Engineer-in-charge. For boulder pitching
518.4
-
-