Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Feb 2024
Closing Date1 Mar 2024
Tender Amount₹ 16,49,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.C. in 1:1.5:3 (M-20) with cement coarse sand, stone grit Including all cost of material, its carriage, labour, T&P and etc completion of the work.

21.36

-

-

... More
Reinforcement for R.C.C. work I/c cutting, placing, bending, binding, with G.I. wire with it's cost, its carriage, labour, T&P and etc required completion of the work.

0.08

-

-

... More
Centring and shuttering I/c all cost of labour, T&P and etc required completion of the work.

217.76

-

-

... More
R.C.C. in 1:2:4 (M-20) with cement, coarse sand, stone grit including all cost of materials, its carrriage labour, T&P and etc completion of the work. But execluding all cost of reinforcement and C/S.

0.67

-

-

... More
R.C.C. in 1:1½:3 (M-20) with cement, coarse sand, stone grit including all cost of materials, its carrriage labour, T&P and etc completion of the work. But execluding all cost of reinforcement and C/S.

0.67

-

-

... More
Supply and fixing of Precast R.C.C (M-25) boundry wall with precast H shaped column of size 150mmx 150mm, 2.4M Long with 7 No of 4mm HTS wire and precast panel of size 2100mmx300mmx50mm with 4No of 4mm HTS wire including all cost of material, labours, T&P etc.

640.44

-

-

... More
12.50 mm thick cement plaster in 1:3 with cm I/c all cost of materials ,its carriage, labour, T&P and etc completion of the work.

5.62

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer over the plastered wall surface to prepare the surface even and smooth complete. I/c all cost of materials, its carriage, labour, T&P and etc completion of the work.

5.62

-

-

... More
Providing and painting of walls with primium acrylic smooth exterior paint with silicone Additives of reqiured shade two coats with Priming coat all cost of material, labour, T&P and etc completion of the work.

1356.39

-

-

... More
Fabrication of steel gate and gate frame I/c cutting, drilling, welding, riveting and hinges where necessary and fixing in position I/c all cost of materials,its carriage one coat of red oxide primer, labour T&P and required proper completion of the work.

1

-

-

... More
Painting Sign board Including Writting the letters and cost of materials (paint), labour, T&P and etc completion of the work.

7.72

-

-

... More
Painting of Iron/ Wood work two coats over one coat of primer Including all cost of materials (paint), labour, T&P and etc completion of the work.

26.22

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.