Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 8,80,000
Costs
EMD
₹ 88,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_981710_2Bid Award Id
ViewTender No
03 / E E / Matatila / 2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P/F four seater circuler swing made of FRP and steel with height of 1.80m area 1.20m x 1.50m including supply, carriage, fixing, instalation,labour, material all lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge.
1
-
-
... More
P/F febricated Nursery combo set made of FRP and steel area 2.40m x 4.00m including supply, carriage, fixing, instalation,labour, material all lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge.
1
-
-
... More
P/L 80 mm thick Interiocking concrete block pavement laid in stone dust base and fill joint with fine sand. joint filled after lablling and dressing base including earth work in excavation in foundation supply of all material, labour, T&P etc. requlred for proper completion of the work. As per directed by Engineer -in charge.
155.04
-
-
... More
P/L of plain cement concrete 1:3:6 laid in floor i/c cost of all lead, lift, material, labour, T&P ,mechanical mixing and vibration etc complete in all respect. As per directed by Engineer -in charge.
7.2
-
-
... More
R.R.Stone masonry in 1:4 cement mortar in wall i/c cost of all lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge.
20
-
-
... More
20 mm thick cement plaster in 1:5with cement sand mortar including all cost of labour, material,T&P , etc complete As per directed by Engineer -in charge.
34
-
-
... More
Two coat white washing painting on new surface with asian/ berger including cost of all material, with prime coat ,labour , T&P etc complete As per directed by Engineer -in charge
484.25
-
-
... More
walls painting in Two coat with acrylic emulsion paint having VOC less than 50 gm/litre resistance, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour new surface with all cost of labour, material,T&P etc as per direction of Engineer- in-charge .
484.25
-
-
... More
walls painting in one coat with acrylic emulsion paint having VOC less than 50 gm/litre resistance, of approved brand and manufacturer including scrapping old surface applying additional coats wherever required to achieve even shade and colour with all cost of labour, material,T&P etc as per direction of Engineer- in-charge
773
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements