Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil Works Others
Eprocure
Opening Date7 Jan 2020
Closing Date13 Jan 2020
Tender Amount₹ 1,44,22,294 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,80,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPIDC_420747_1Bid Award Id
ViewTender No
06/SE/NAVAM/2019-20Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P/L R.C.C. 1:1.5:3 in step with grit 10-20 mm size coarse sand in construction of ghat including cost of all material, labour and T&P etc. required for proper compleiton of work.
100.54
-
-
... More
S/L C.C. 1:2:4 under step of Ghat including cost of all material, labor and T&P required for proper completion of work.
130.4
-
-
... More
S/L of shinghle 150mm thick as filter 12 to 20mm under Ghat including cost of all material, labor and T&P required for proper completion of work.
88.13
-
-
... More
S/L of coarse sand 150mm thick as filter under Ghat including cost of all material, labor and T&P required for proper completion of work.
88.13
-
-
... More
S/L local sand in filter under ghat including cost of all material, labor and T&P required for proper completion of work under the Ghat.
245.27
-
-
... More
S/L fine dressed stone patia in 1:3 cement and coarse sand mortar on ghat platform, steps andside walls etc. including cost of all material, labour and T&P required for completion of work.
896.12
-
-
... More
S/F nominal steel in conc. slab for ghat including cost of all material, labour and T&P etc. required for completion of work.
9.31
-
-
... More
Hiring of 2 Pumps for 15 hours for 10 days of 5 HP deisel pump including operetor and P.O.L.
300
-
-
... More
Supplying of Mirzapur Stone Boulder 20 to 40 Kg. including Royalty, Trade Tax, Carriage from quarry to Stack yard
336
-
-
... More
Supplying /Laying of stone grit 10-20mm under pitching work as a filter material.
102
-
-
... More
E/W in coffer dam with new E.C. Bag filled with Earth putting in Nylon Crates size (1.0x1.0x1.0) in i/c all lead & lift with proper completion of work.
13440
-
-
... More
Centering and Shuttering for R.C.C. work including cost of all materia, labour and T&P required for proper completion of work.
982
-
-
... More
Earth work in excavation of foundation for toe walls and sleepers of ghats including ramming, dressing all leads and lifts for disposal of excavated earth.
50.84
-
-
... More
P/L C.C. 1:3:6 in foundation with cement, coarse sand and stone ballast (4.75 to 40 mm size) including cost of all material labour and T&P required for proper completion of work.
36.64
-
-
... More
Brick Work in 1:6 Cement, course sand mortar in foundation including cost of all material labour & T&P. required for completion of work.
20.05
-
-
... More
P/L C.C. 1:1.5:3 with grit 10-20 mm size coarse sand in construction of Funeral Shed column & steps including cost of all material, labour and T&P etc. required for proper compleiton of work.
39.33
-
-
... More
P/L C.C. 1:2:4 with grit 10-20 mm size coarse sand in construction of Funeral Shed Slab,Beam & Bench including cost of all material, labour and T&P etc. required for proper compleiton of work.
51.67
-
-
... More
S/L fine dressed stone patia in 1:3 cement and coarse sand mortar on Funeral Shed floor, steps and pillar etc. including cost of all material, labour and T&P required for completion of work.
237.46
-
-
... More
S/F nominal steel in conc. slab for Funeral Shed including cost of all material Cutting, bending, binding and placing of reinforcement including cost of binding wire but excluding cost of steel.
4.97
-
-
... More
Distempering with dry distemper of approved brand (two coats) over one priming coat of whiting on new surface after thoroughly brushinh the surface free from dropping and other foreign matter including preparing the surface even and sand papered smooth including cost of all materils, labour & T&P.
401.63
-
-
... More
Centering/Shuttering work for C.C. and R.C.C. Work.including cost of all material, labour and T&P required for completion of work.
560
-
-
... More
Local Sand filling upto plinth level in the Funreral shed compaction, with dressing and manual compaction completion of work. required for completion of work.
52.27
-
-
... More
Earth work by power Tranport for a lead of upto 1 Km. including excavation loading, unloading & Royalty manual compaction and dressing including all lift rates shall be applicable for lead beyond 630m and upto 1Km.
1500
-
-
... More
Providing and laying of interlocking concrete block on pavement having thickness 80mm as per drawing including cost of all material, labour and T&P required for completion of work.
2667.6
-
-
... More
Brick edging on the side of interlocking road including cost of all material, labour and T&P required for completion of work.
8.4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements