Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Feb 2025
Closing Soon25 Feb 2025
Tender Amount₹ 1,23,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc.- for canal syphon

415.62

-

-

... More
Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc.

633.47

-

-

... More
Cutting, bending , placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc.

23.11

-

-

... More
Laying C.C.A20 - M-10 with cement (OPC 43 grade),coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.

49.68

-

-

... More
Laying C.C.A20 - M-15 with cement (OPC 43 grade),coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.

396.91

-

-

... More
Laying C.C.A20 - M-20 with cement (OPC 43 grade),coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.

64.8

-

-

... More
Laying C.C.A20 - M-25 with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.

65.21

-

-

... More
Earth work in removing obstruction for channelisation of drains with dressing including hard clay,charri bajri upto 5% lead upto 30 meters, lift upto 3meters excluding mechnical compaction but inclusive of manual compaction as per direction of E/I including cost of T&P & labour etc required for proper completion of work.

2451.88

-

-

... More
E/W in filling in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work.

1048

-

-

... More
Providing and laying inverted filter with 1 layer of coarse sand of F.M. not less than 2.0 and 1 layer each of 4.75 to 10 mm and 10 to 20 mm size crushed stone grit (granite) including cost of all material, T.& P., labour etc. required for proper completion of work.

131.12

-

-

... More
Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work..

45133

-

-

... More
Carrying & laying stone Boulder (Weight from 40-60Kg and min dimension of 200mm) for canal outer slope protection and apron required for proper completion of work including cost of all material, T&P & labour etc.

137.54

-

-

... More
Laying 1200mm dia NP-3 hume pipe for constructing canal syphon required for proper completion of work including cost of al materials, labour, T&P etc.

42.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.