Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date26 Feb 2024
Closing Date4 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in foundation with proper disposal.

5799

-

-

... More
Laying C.C. 1:3:6 in Foundation 20 to 40 mm stone ballast in coarse sand The rate includes all labour and T&P

488.5

-

-

... More
1st class brick work in 1:4 CM with coarse sand. The rate includes all labour and T&P

779.8

-

-

... More
1st class brick work in 1:3 CM with coarse sand. The rate includes all labour and T&P

1152.15

-

-

... More
Struck deep cement pointing In 1:2 C.M.

7654.4

-

-

... More
Centering and shuttering for Rcc. The rate includes all labour and T&P

461.25

-

-

... More
Centering and shuttering for PCC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.

3027.3

-

-

... More
Cutting Bending Binding of Steel in Slab the rate includes all labour and t&P

2.12

-

-

... More
C.C. 1:1.5:3 with dalla grit 10 to 20 mm and coarse sand.

526.19

-

-

... More
C.C. 1:2:4 with dalla grit 10 to 20 mm and coarse sand.

481.71

-

-

... More
Removing of diversion with proper disposal

750

-

-

... More
Laying Local local sand fill for making base of concrete including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.

967.7

-

-

... More
Laying coarse sand fill for making base of concrete including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.

330.7

-

-

... More
Laying stone grite fill in 50 mm thick size (12.5-20 mm) for making base of concrete including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification

330.7

-

-

... More
Supplying and laying 150 micron LDPE film below CC lining including cost of material , labour,T&P etc complete in all respect.

9516.4

-

-

... More
Supplying and laying Geo textile sheet made of 200 gsm woven multifilament polypropylene yarn below CC lining including cost of material, labour, T&P etc complete in all respect.

7173

-

-

... More
12 mm thick plaster with cement mortar inproportion of 1:4 cement and sand of 1.25 F.M. over brick work minium thickness not be less than 10 mm including supply of all materials,labour and T&P etc required for proper, comletion of work.

570.95

-

-

... More
12 mm thick plaster with cement mortar inproportion of 1:3 cement and sand of 1.25 F.M. over brick work minium thickness not be less than 10 mm including supply of all materials,labour and T&P etc required for proper, comletion of work.

939.3

-

-

... More
Supply and fixing PVC pipe 110 mm for drainge spout ,labour, t&p etc. required for proper completion of work.

321.5

-

-

... More
Supply and fixing PVC pipe 160 mm for drainge spout ,labour, t&p etc. required for proper completion of work.

19.5

-

-

... More
Fixing of RCC precast boundery piller including cast of all material, labour and T&P etc, required for proper complition of work as per direction of Engineer -in -charge.

270

-

-

... More
Painting of including cast material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.

1094.15

-

-

... More
Write letter including cast material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.

540

-

-

... More
Repair of Regulator (febrication of steel sheet , spendal rod,oiling greasing etc) &painting including all labour and materials.

45.95

-

-

... More
Uprooting moonj, Narkool etc with proper disposal

96500

-

-

... More
Earth work in maintaing section with proper dressing and mannual compaction

91704

-

-

... More
Filling empty cement bags with earth tying and sewing with sutali including cost of material& empty cement bag and placing including lead of 110 m.

47103.1

-

-

... More
Making subgrade including cost of all labour,T&P etc .

7173

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.