Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date1 Mar 2024
Closing Date6 Mar 2024
Tender Amount₹ 3,79,00,000 
Notes
Download

Costs

Summary

Restoration Of Earthen Section And Pucca Works And Demarcation Of Canal Land

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P/L C.C. 1:3:6 in foundation and gravity floor with one part of cement , three part of coarse sand and six part of stone ballast 20 to 40 size including cost of all materials labour, T&P etc required for proper completion of work.

1486.5

-

-

... More
First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.

2329

-

-

... More
Centering and shuttering for R.C.C. and C.C. work including cost of all materials labour, T&P etc required for proper completion of work .

457.9

-

-

... More
Bending, Binding, Cutting and placing in position steel reinforecement including cost of all materials labour, T&P etc required for proper completion of work.

13.2

-

-

... More
P/L R.C.C. 1:1.5:3 in slab with one part of cement , one& half part of coarse sand and three part of hard stone grit 4.75 to 20mm size including cost of all materials labour, T&P etc required for proper completion of work.

85.45

-

-

... More
P/L C.C. 1:1.5:3 in wearing coat over slab with one part of cement , one half part of coarse sand and three part of hard stone grit 4.75 to 20mm size including cost of all materials labour, T&P etc required for proper completion of work.

48.9

-

-

... More
Deep ruled cement pointing in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.

7277

-

-

... More
First class Brick pitching on edge over road ramp , diversion filling joint with local sand including all cost of materials , labour , T&P etc complete required for proper completion of work .

2458.35

-

-

... More
P/F wheel gaurd of stone as per direction of engineer in-charge including cost of all materials labour, T&P etc required for proper completion of work.

48

-

-

... More
Painting parapets and other structure ,side slabs etc with water proofing cement paints of approved make quality and of required shed on new wall surface two coat over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered material including curing and cost of all material.

1564.3

-

-

... More
Fabrication and supply sign board on angle iron framd 40 x 40 x 6 mm. 25 x 5 mm. flat iron board sand 16 SWG M.S. Sheet of board size 1200x900 including two coat of iron work approved synthetic enamel paint and lettering,fixing of sign board at canal head by c.c. 1:4:8 including cost of all material, labour, T&P etc. required as per directed by Engineer in charge as per approved drawing. inclosed.

11

-

-

... More
Renovation of steel gate by taking out rusted &damaged leaf with channel and providing outer channel,spendle rod,inner channel check nut and mild steel leaf with other accesseries as per requered including cost of all material, labour, T & P etc. required for proper completion of work .

10.5

-

-

... More
Laying double layer of brick in lining in 1:3 cement mortar on the sides of channel including 8 mm thick cement plaster on the top including curing ,scafolding etc. with cost of all materials,labour T&P etc. required for proper completion of the work

550

-

-

... More
Providing & Fixing 150 mm outlets including earth work and labour charges for fixing collars and making joints water tight.

662.4

-

-

... More
P/L LDPE film on footing box including cost of all materials labour, T&P etc required for proper completion of work.

154.4

-

-

... More
P/Fixing Precast RCC Boundry Pillar including cost of all materials labour, T&P etc required for proper completion of work.

156

-

-

... More
P/L R.C.C. 1:2:4 in foundation including cost of all materials labour, T&P etc required for proper completion of work.

10.9

-

-

... More
Dismantling old and damaged stone pitching including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60 M.

126.9

-

-

... More
R.R. Stone masonary in 1:4 c.m. including cost of all material labour.T&P etc.required for proper completion of work.

80.5

-

-

... More
Relaying damaged pitching on side slope of NPC including cost of all material labour.T&P etc.required for proper completion of work

57.9

-

-

... More
Earth work in cutting for correcting section of canal etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .

1770

-

-

... More
Earth work in filling for correcting section & strengthing bank of canal , road diversion and ramp etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .

45004

-

-

... More
Filling E.C. bag with earth/sand available at site in internal scoured portion of canal to protect banks including stitching with cost of sutali and placing at site up to 60 m lead including cost of all material, labour, T&P etc. required for proper completion of work.

65143

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.