Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Eprocure
Opening Date12 Mar 2021
Closing Date18 Mar 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying C.C. 1:1.5:3 (M–20) in foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

116

-

-

... More
Centering & shuttering for C.C./R.C.C. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

377

-

-

... More
Laying R.C.C. (M–25) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering. in construction of different parts of structure as per direction of Engineer-in-charge.

91

-

-

... More
Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

9

-

-

... More
Laying & Fixing joint filler board (18m.m. thick) including cost of all materials, labour, T& P etc. required for proper completion of work as per direction of Engineer-in-charge.

10

-

-

... More
Providing and fixing PVC Pipe in drainage spout & weep hole including cost of all materials, labours, T&P etc, required for proper completion of work as per direction of Engineer-in-charge.

36

-

-

... More
Laying 3 m.m. thick Polyplus Multyplast tar paper over bed block including cost of all materials, labours, T&P etc, required for proper completion of work as per direction of Engineer-in-charge.

6

-

-

... More
Providing expansion joint in concrete including placing and fixing of angle iron & M.S. plate and filling with bitumen including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

13

-

-

... More
Earth work in filling in embankment including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. with including proper dressing as per direction of Engineer-in-charge.

136

-

-

... More
Supplying and laying coarse sand in ramp including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

29

-

-

... More
Laying dry stone boulder pitching including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.

29

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.